My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-28-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
07-28-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2014 11:43:40 AM
Creation date
7/25/2014 11:42:42 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Regional Roadway System <br />The regional roadway system is expected to include many improvements in the near future. Changes <br />include reconstruction of I-35W interchanges at CR H and CR 96. For this traffic study, these changes were <br />included for purposes of regional trip distribution and anticipated intersection geometrics. An analysis of the <br />freeway operations will be conducted as part of the Interstate Access Modification Request, as required for <br />these interchange projects. Any significant changes in the AUAR study area redevelopment plan will need to <br />be analyzed as either an AUAR update, or the applicable regional roadway system projects. <br />Existing Conditions Traffic Analysis <br />The existing conditions analysis includes both unsignalized and signalized intersections. For this AUAR <br />level analysis, signal timing for all scenarios have been optimized to provide estimates of potential traffic <br />operational conditions. The results are presented in Table 18-2. <br /> <br /> <br />July 2014 Final AUAR 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.