<br />Figure T15 (Appendix D). The improvements that were considered between the baseline and No Build <br />scenarios primarily were discussed previously. Overall the baseline improvements helped the system <br />maintain an LOS D or better at almost all of the intersections with the exception of the CR 96 and the <br />Property access located at the entrance to the AUAR study area site in the AM peak (LOS F). The major <br />movement contributing to the LOS F is the westbound movements. Due to a high westbound through <br />volume and a lack of capacity, the traffic conditions deteriorate causing high delays. <br />During the PM peak three intersections are expected to operate at LOS E or LOS F (see Table 18-5). <br />Maximum Development Scenario <br />The maximum baseline development scenario turning movements were generated by adding the site <br />generated traffic to the 2030 No Build scenario turning movement volumes. The turning movement volumes <br />for this scenario are shown in Figure T17 (Appendix D). The improvements that were considered between <br />the baseline and No Build scenarios primarily consisted of signalizing the CR-96 and I-35W ramps as well <br />as some geometric changes discussed previously. Similarly to the Minimum Baseline Scenario there are <br />some intersections that are operating at LOS E or F (see Table 18-5). <br />c.I <br />DENTIFY MEASURES THAT WILL BE TAKEN TO MINIMIZE OR MITIGATE PROJECT RELATED TRANSPORTATION <br />. <br />EFFECTS <br />Mitigated Roadway Network Scenario Traffic Analyses <br />Minimum Development Scenario Results <br />The analysis for this 2030 Minimum scenario incorporated the 2030 minimum baseline elements plus the <br />following recommended mitigation measures: <br />TH 96 westbound auxiliary lane from east of the project boundary to TH 10. <br />Re-introduction of CR H southbound loop access to I-35W (removed as part of the baseline scenarios), <br />which remains barrier separated from I-35W southbound exit ramp to TH 10 southbound, and enters I- <br />35W after joining the TH 10 southbound access ramp to I-35W southbound. <br />The County is in the process of redesigning the I-35W/CR 96 interchange. The new interchange will be <br />designed to accommodate anticipated future traffic, including the TCAAP development. <br />At the intersection of Round Lake Road W at CR 96, the lane use of the northbound center lane is <br />recommended to be modified from an existing shared left/through lane to a shared left/through/right <br />lane. <br />At the intersection of CR H at TH 10, an additional eastbound left turn lane is recommended. <br />With these mitigation measures incorporated, all intersections were operating at LOS D or better with no <br />anticipated operational issues in the AM and PM scenarios. The analysis results are presented in Table 18- <br />6. <br />Table 18-6. 2030 Minimum Development Scenario Peak Hour Mitigation Traffic Analysis Results <br />2030 Baseline Min Mitigated AM 2030 Baseline Min Mitigated PM <br />Intersection <br />LOS LOS <br />Old Hwy 8 and CR 96 C C <br />CR 96 and SB I-35W Ramp C C <br />CR 96 and NB I-35W Ramp B C <br />Round Lake Rd W and CR 96 C C <br />Old Hwy 10 and CR 96 C D <br /> <br /> <br />July 2014 Final AUAR 31 <br />