My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-28-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
07-28-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2014 11:43:40 AM
Creation date
7/25/2014 11:42:42 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Roadway Connections to County Road I <br />Ramsey County has indicated that at some future time a roadway connection from the AUAR study area to <br />County Road I may be deemed necessary. Extending Old Highway 8 which provides access to the MnDOT <br />parcel north of the AUAR study area that includes a driving facility, is one possible opportunity, but is only <br />80 feet east of the I-35W east ramp/Rice Creek Parkway intersection. Extending North Fairview Avenue <br />south into the northeast corner of the site is another possible opportunity. These connections may provide <br />relief to the intersection at the east ramps of I-35W and County Road H as well as provide additional <br />emergency vehicle access to the AUAR study area, however, is not determined necessary based on current <br />traffic studies (thru 2030). Relevant traffic and environmental studies related to these connections would be <br /> <br />completed in a separate document, if and when it is determined necessary. <br />c.D <br />ISCUSS THE NATURE OF THE CUMULATIVE POTENTIAL EFFECTS AND SUMMARIZE ANY OTHER AVAILABLE <br />INFORMATION RELEVANT TO DETERMINING WHETHER THERE IS POTENTIAL FOR SIGNIFICANT ENVIRONMENTAL <br />. <br />EFFECTS DUE TO THESE CUMULATIVE EFFECTS <br />Impacts resulting from the development of the AUAR study area include wetlands, wildlife, soil remediation, <br />and traffic. Impacts of the future road projects may have impacts to wetlands and traffic. The planned future <br />road improvements will result in a cumulative benefit to traffic conditions. All other impacts from these future <br />projects will be addressed via regulatory permitting and approval measures, therefore individually mitigated <br />to ensure no cumulative impacts occur to resources such as wetlands. <br />20.OPEE <br />THER OTENTIAL NVIRONMENTAL FFECTS <br />I119, <br />F THE PROJECT MAY CAUSE ANY ADDITIONAL ENVIRONMENTAL EFFECTS NOT ADDRESSED BY ITEMS TO <br />,, <br />DESCRIBE THE EFFECTS HERE DISCUSS THE HOW THE ENVIRONMENT WILL BE AFFECTED AND IDENTIFY <br />. <br />MEASURES THAT WILL BE TAKEN TO MINIMIZE AND MITIGATE THESE EFFECTS <br /> <br />No additional environmental effects are anticipated. <br /> <br /> <br /> <br /> <br />July 2014 Final AUAR 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.