Laserfiche WebLink
<br />8.PAR <br />ERMITS AND PPROVALS EQUIRED <br />Unit of Government Type of Application/Approval Status <br />National Pollutant Discharge <br />Elimination System Stormwater To be applied for <br />Permit for Construction Activities <br />Minnesota Pollution Control <br />Agency <br />Sanitary Sewer Extension Permit To be applied for <br />Soil and Groundwater Remediation <br />To be applied for, if needed <br />Plan Approval <br />Abandonment of Water Wells To be applied for <br />Minnesota Department of Health <br />Water Main Installation Permit To be applied for, if needed <br />Groundwater Appropriation Permit <br />To be applied for, if needed <br />Minnesota Department of Natural <br />(Construction) <br />Resources <br />Public Waters Work Permit To be applied for <br />Comprehensive Plan Amendment To be applied for <br />Metropolitan Council <br />Sanitary Sewer Extension Permit To be applied for <br />Stormwater Management, Erosion <br />Rice Creek Watershed District Control, Floodplain Alteration, To be applied for <br />Wetland Alteration <br />Preliminary and Final Plat approvals <br />Joint Development Authority Pending, by developers <br />Development reviews/approvals <br />Boundary Plat approval To be applied for <br />AUAR Approval In process <br />Comprehensive Plan Amendment To be applied for <br />Zoning Change Approval To be applied for <br />City of Arden Hills <br />Grading, Excavation and <br />To be applied for <br />Foundation Permits <br />Building and Utility Permits To be applied for <br />Erosion Control Permits To be applied for <br />Utility permits in County Road right- <br />To be applied for <br />of-way <br />Ramsey County <br />Access permits (connection to <br />To be applied for <br />County Road) <br />Hazardous waste permits Approved <br />11.WR <br />ATER ESOURCES <br />Potential impacts and mitigation measures are the same under both Development Scenarios for water resources. <br />Potential Impacts <br />Regional wastewater collection and treatment facilities and municipal wastewater pipes serving the Study <br />Area have sufficient long-term capacity to handle the additional wastewater flow generated by both the <br />Zoning and Maximum Development Scenarios. <br />Sanitary sewer will need to be extended into the Study Area to provide sewer service to the various lots. <br />Temporary dewatering may be required during project construction, particularly for buildings to be <br />constructed with lower levels, for which caissons could be used to facilitate installation of footings and <br />foundations. <br /> <br /> <br />July 2014 Final Mitigation Plan 2 <br />