My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
09-08-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 3:51:05 PM
Creation date
9/15/2014 9:11:42 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> <br />DATE: September 8, 2014 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />Patrick Klaers, City Administrator <br /> <br />FROM: Terry Maurer, Public Works Director <br /> <br />SUBJECT: Rolling Hills Area <br />Order Feasibility Report <br /> <br />Requested Action <br /> <br />Adopt Resolution 2014-041 Ordering Preparation of the Feasibility Report for the 2015 <br />Pavement Management Program (Rolling Hills Area). <br /> <br />Background/Discussion <br /> <br />The draft 2015 Capital Improvement Program (CIP) contains an item for a 2015 PMP in the <br />Rolling Hills Area. The area of this 2015 PMP is shown on the attached exhibit. <br /> <br />As with previous PMP’s, the Feasibility Report will include a geotechnical investigation, <br />topographic survey of the area, an analysis of the existing sewer and water sys tems, preliminary <br />design of the street and drainage improvement, cost estimate and proposed assessment. The <br />Feasibility Report will be prepared by John Anderson, Assistant City Engineer. Consultant and <br />subcontractor services for the items which cannot be completed by City staff such as topographic <br />survey, geotechnical investigation and AutoCAD services will be obtained. <br /> <br />As part of the Feasibility Report a neighborhood informational meeting will be held at City Hall. <br />At that meeting an overview of the potential project, timing and estimated cost and assessment <br />will be presented. <br /> <br />Staff recommends that this project and the Grant Road, Noble Road, Fairview Avenue and Lake <br />Lane 2015 PMP follow similar but separate paths through the Feasibility Report phase. If both <br />projects proceed to construction, staff would recommend that the two PMP projects be combined <br />for purposes of bidding and construction to gain the advantages of economy of scale. <br /> <br />Attached is Resolution No. 2014-041 Ordering the Preparation of the Feasibility Report for the <br />2015 Pavement Management Program (Rolling Hills Area). <br />NEW BUSINESS – 9A <br /> <br /> <br />MEMORANDUM <br />
The URL can be used to link to this page
Your browser does not support the video tag.