My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
09-08-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 3:51:05 PM
Creation date
9/15/2014 9:11:42 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> <br />DATE: September 8, 2014 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />Patrick Klaers, City Administrator <br /> <br />FROM: Terry Maurer, Public Works Director <br /> <br />SUBJECT: Consultant Services for 2015 PMPs <br /> <br />Requested Action <br /> <br />Authorize entering into contracts with Elfering and Associates and Element Materials <br />Technology for engineering/surveying and geotechnical work for the two 2015 PMP Feasibility <br />Reports. The maximum cost for services by each firm on the two PMP Feasibilit y Reports is as <br />follows: <br /> <br /> Rolling Hills Area <br /> <br />Grant/Noble/Lake Lane <br />Element Materials Testing $ 3,450.00 <br /> <br /> $ 2,850.00 <br />Elfering and Associates $74,225.00 <br /> <br /> $48,255.00 <br /> <br />TOTAL <br /> $77,675.00 $51,105.00 <br /> <br />Background/Discussion <br /> <br />The last two items on the agenda were to order Feasibility Reports for the two 2015 PMP areas; <br />the Rolling Hills neighborhood and the Grant, Noble and Lake Lane neighborhoods. These two <br />studies will be conducted by City staff with the help of consultants for the services we are unable <br />to perform in-house. Those services include things like topographic survey, geotechnical <br />investigation, and AutoCAD drawing of preliminary plan sheets. <br /> <br />Staff requested a proposal from Elfering and Associates, who have provided similar services on <br />the 2011 and 2013 PMPs, for specific services that the Assistant City Engineer is unable to <br />NEW BUSINESS – 9C <br /> <br /> <br />MEMORANDUM <br />
The URL can be used to link to this page
Your browser does not support the video tag.