My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
09-08-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 3:51:05 PM
Creation date
9/15/2014 9:11:42 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION – JULY 28, 2014 3 <br /> <br />the Assessment Hearing before the project is bid. The largest part of the assessment is for <br />street lighting and staff will have a firm price from Xcel Energy by the Hearing date. The <br />rest of the assessable improvements will be fully designed and the engineer’s estimate <br />should be accurate enough for assessment purposes. This way, if there are a number of <br />potential assessment appeals the Council could decide to not proceed to bidding the <br />project. <br /> Staff would recommend adding colored pavers to the new medians. This was not discussed <br />in the feasibility report but would add a nice feature to a relatively large blacktop road. The <br />incremental cost to add pavers from standard concrete for the medians is estimated at <br />$30,000-45,000 for the entire project. <br /> Staff would recommend adding the trail/sidewalk on the south side of County Road E <br />between the new bridge and Old Snelling Avenue to this project. The easiest time to build <br />this segment would be when the bridge is closed and there could be some economies of <br />scale to add this similar type of work to the County Road E project. Staff has asked Bolton <br />and Menk to prepare a cost estimate for just the initial analysis to determine if it is <br />possible to have this work added to the bid package for County Road E (if we need <br />temporary construction easements it may not be possible to get done in time). The added <br />cost would be $14,680 for a topographic survey, property/right-of-way research and <br />preliminary design at which time a decision would be made whether or not this work could <br />catch up to the rest of the project. If not, the work done by Bolton and Menk would not be <br />wasted; it would be useable work for the continuation of the project at a later time. <br /> <br />The proposed project schedule moving forward would be: <br /> <br /> Completion of the plans and review by City, Ramsey County, MnDOT office of State Aid <br />in the next 60-90 days <br /> “Walk through” with the property owners to review the final project details late summer <br /> Public Hearing/Assessment Hearing early November <br /> Project bidding in November, early December <br /> Consider awarded of the contract in January <br /> Start construction in Spring of 2015 to coincide with MnDOT’s bridge project <br /> <br />City Administrator Klaers reviewed his memo on financial and assessment issues. Items for the <br />Council to consider include the Connelly Street improvements, street lighting, trees, and adding <br />pavers in the street medians. <br /> <br />Staff requested comments and direction from the Council. <br /> <br />Discussion ensued regarding the possible future redevelopment of the Pot O’Gold property. The <br />council was in agreement to leave the Connelly Street improvements in the project at this time. <br /> <br />Councilmember Holmes asked how much the City would have to pay for the more expensive <br />light fixtures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.