My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-21-14-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
07-21-14-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 3:51:40 PM
Creation date
9/15/2014 9:20:09 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City Council Meeting <br />P:\Admin\Council\Agendas & Packet Information\2014\06-16-14-WS\CIP\2015 CIP Preliminary - <br />Memo.docx <br />Page 3 of 3 <br /> Re-inserted in 2015 the reconstruction of Lift Station #11 since it was not <br />able to be cost-effectively eliminated with the Round Lake Road project in <br />2014. (+$225,000) <br /> <br />H. Water Department <br /> Revised the cost of repainting and minor structural repairs for the north tower <br />in 2015. (+$200,000) <br /> <br />I. Equipment <br /> Moved the Roller from 2014 to 2015 and increased the cost by $15,000. <br /> Added the replacement of current trailers; one in 2015, one in 2017 and one in <br />2018. <br /> Moved the purchase of a mini excavator ($70,000) from 2016 to 2015, which <br />will be more useful with the upcoming storm sewer and ponding maintenance <br />items. This item was also increased by $25,000. <br /> Removed Replace J Type Tamper from CIP (2016). <br /> Moved Replace 1997 Street Sweeper from 2015 to 2016. <br /> Moved Replace Jetter and Vactor Truck with Combo Machine from 2017 to <br />2015 <br /> Increase cost for Replace 2004 Hotbox pothole patching equipment to increase <br />size from existing 2 CY to a 4 CY to minimize time spent traveling to get <br />material. <br /> Moved Replace Air Compressor from 2016 to 2017. <br /> Moved Replace Two Toro Z Mowers from 2017 to 2018. <br /> Moved Replace Large Area Mower from 2015 to 2018. <br /> Continued to add normal replacement of pickup trucks, one-ton trucks and <br />plow trucks. <br /> Increased cost for Replace 2001 Workman (2016) to more accurately reflect <br />estimated cost. <br /> Added replacement of easement machine for sewer cleaning to 2019. This <br />piece of equipment is owned jointly by Arden Hills and White Bear Twsp. <br /> Added equipment to 2018 for the anticipated development of TCAAP <br />including mowers, pickup, one-ton and plow truck. As TCAAP develops these <br />items will be moved to appropriate years. <br /> <br />Council Action <br /> <br />Staff would like input from the City Council on the 201 5-2019 Five-Year CIP and the 2015- <br />2019 equipment. Development of a five-year CIP is needed to enable the creation of a long- <br />range financial plan for the City to evaluate reserve balances and to analyze available funds <br />for future projects. This is a living document and only meant to be a “guiding plan”. As <br />each project or purchase is made, it must be brought to the City Council for discussion and <br />approval. Only the 2015 expenditures will be included in the 2015 Operating Budget. This <br />plan will be brought to the December 8, 2014 Council meeting for final approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.