My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-4-14-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2014
>
06-4-14-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 3:33:34 PM
Creation date
9/22/2014 3:19:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br /> <br />Infrastructure Study <br /> <br />The team of Kimley-Horn and Associates and Wenck Associates was selected by Ramsey <br />County and the City of Arden Hills for the development and design of the TCAAP <br />Redevelopment Site Infrastructure. Their scope of services addresses design of public <br />infrastructure including roadways, drainage, and stormwater management features, and utilities <br />to support the redevelopment. The consultants will spend the next several months developing <br />preliminary design layouts for the Spine Road, thumb road connection to County Road I, <br />regional stormwater management system, grading plan, mitigated wetlands, and sanitary sewer <br />and water supply systems. Their work will require close coordination with ongoing planning and <br />remediation activities and development of the adjacent interchange on County Road H at I-35W. <br /> <br />The preliminary designs will enable the consultant team to develop refined construction cost <br />estimates to assist in the development of an infrastructure financing plan. The consultant team <br />will also ultimately prepare construction documents for public bidding of the site infrastructure <br />improvements. <br /> <br />Upcoming Meetings <br /> <br />With City Council approval of the master plan land use map tentatively scheduled for June 30, <br />2014, staff and consultants are beginning to schedule work for the regulations and policies <br />component of the master planning process. Topics for Planning Commission and City Council <br />work session discussions will be identified in the next month. <br /> <br />Attachments <br /> <br />A. Draft Master Plan Land Use Map, December 2013 <br />B. Revised Draft Master Plan Land Use Map, May 2014 <br />C. Draft Open Space Plan, December 2013 <br />D. Revised Draft Open Space Plan, May 2014 <br />E. Summary of public comments on the Draft AUAR and Mitigation Plan <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.