<br />CoBeck Construction Company, LLC <br />218 13th Avenue South, Suite 300 <br />South St. Paul, MN 55075 <br />651 756.7521 <br /> <br /> <br />September 3rd, 2014 <br />Revised September 26th 2014 <br /> <br />Mr. Ryan Streff <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />Re: Gradient Financial, Arden Hills, MN – Exterior Improvements <br /> <br />Dear Mr. Streff <br /> <br />I am submitting a site plan review on proposed exterior renovations to 4105 Lexington Ave N complex. <br />The purpose of this is to allow for additional parking and site modifications necessary to the overall flow <br />and modifications proposed by the county to Lexington Ave and County Road F. The modifications are <br />indicated in the following numbers and on the attached site plans. <br /> <br />The modifications in Phase 1 would include relocation of the main entrance and lot modifications for <br />additional parking areas. Relocation of the entrance by the county would better serve Gradient Center <br />and the adjacent properties alleviating conflicts for entry on to County F form the adjoining properties. <br />Relocation would also better serve flow and appearances for the Gradient Center providing a more <br />cohesive site plan. Modifications in Phase 1 would include modifications to the lot to accommodate the <br />relocation of the south entrance and additional parking areas required to minimize stall losses due to <br />county changes in Phase 2. <br /> <br />The modifications in Phase 2 on the site plan would include corrections along Lexington Ave to add a <br />right turn lane and eliminate the east entrance to the property. This is being driven by the county to <br />reduce traffic conflicts and concerns about the safety of the east entrance onto Lexington Ave. <br />Modifications to the lot would be to minimize parking losses due to easement changes and provide a <br />more cohesive site plan. <br /> <br />The following numbers are based on the proposed plan including the circular drive, the expanded drive <br />entrance to the west, the new garage, and all new curb and bituminous. <br /> <br /> Existing Proposed Phase 1 Proposed Phase 2 <br /> Completed Completed <br />Total site area 226,098 sf 226,098 sf 218,853 sf <br /> <br />Existing office building 24,006 sf 24,006 sf 24,006 sf <br />Existing garage 1,800 sf 1,800 sf 1,800 sf <br />Impervious – concrete 2984 sf 3649 sf 3649 sf <br />Impervious – patio 1,384 sf 1,384 sf 1,384 sf <br />Impervious – parking 107,351 sf 110,091 sf 96,944sf <br /> <br />Total impervious area 137,525 sf 138,852 sf 127,783 sf