The second component of the amendment is to revise the construction schedule outlined in the <br />PUD Development Agreement. Under the current construction schedule, Presbyterian Homes <br />was required to begin site work for the first Brownstone Building in September 2013 and begin <br />construction of the second Brownstone Building in March of 2014. Additionally, all final <br />landscaping and hardscaping improvements for the property were to be completed by the spring <br />of 2015. While Sutton Place has been demolished and the area stabilized, for efficiency reasons <br />Presbyterian Homes does not expect to start on the construction of the Brownstone Buildings <br />until 2015. Therefore, they are requesting that the construction schedule be amended to reflect <br />the revised anticipated schedule. Presbyterian Homes would be required to obtain a Grading and <br />Erosion Control Permit and commence preliminary site work for the Brownstone Buildings by <br />December 31, 2014, and to begin construction on the buildings by June 30, 2015. All final <br />landscaping and hardscaping improvements would need to be completed by December 31, 2016. <br /> <br />Presbyterian Homes is requesting that the four hospice units approved under the Master PUD for <br />the Lakeview Building be reallocated to Brownstone Buildings as independent senior <br />apartments. If approved, the number of units in the buildings would increase from 36 to 40. As <br />discussed previously, the hospice units were approved for the Lakeview Building but were not <br />constructed because a hospice program was not implemented by the organization. The space in <br />the Lakeview Building where the hospice units were to be constructed is now being used as <br />additional storage space for the facility and will not be used for residential purposes. This request <br />would not increase the total of 410 dwelling units approved in the original Master PUD and the <br />approved net density of 18.2 units per acre would remain unchanged. <br /> <br />The final component of the PUD Amendment request is a revision to the conditions in the PUD <br />Development Agreement regarding traffic calming. Presbyterian Homes is now in the process of <br />installing three speed bumps on the County Road D driveway between the parking lot of the <br />primary building and where the Brownstone underground parking will be located, as required by <br />the PUD Development Agreement. The purpose of these speed bumps was to deter residents <br />from using the County Road D access driveway and to limit the amount of traffic that would cut <br />through Wheeler Avenue in Roseville. Presbyterian Homes has noted that the heavy use of the <br />County Road D access has not materialized and that the City of Roseville has taken the <br />additional step of temporarily closing off access to Wheeler Avenue from County Road D. The <br />request is to amend the PUD Development Agreement to state that if upon the completion of the <br />required Wheeler Avenue and County Road D Traffic Study one year after the full <br />redevelopment of the site it is determined that the three speed bumps are not necessary for traffic <br />calming purposes that Presbyterian Homes be permitted to remove them. <br /> <br />Presbyterian Homes has provided a project narrative included in Attachment A that outlines the <br />details of the PUD Amendment request. A complete plan set including civil and architectural <br />plans, as well as elevation and perspective drawings of the Brownstone Buildings, is included in <br />Attachment C. <br /> <br /> <br />City of Arden Hills <br />Planning Commission Meeting for October 8, 2014 <br /> <br />P:\Planning\Planning Cases\2014\PC 14-031 - PUD Amendment - Presbyterian Homes\Memos_14-031 <br /> <br />Page 3 of 15 <br />