My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-27-14-WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2014
>
10-27-14-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 2:18:24 PM
Creation date
10/22/2014 9:18:10 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION—OCTOBER 27, 2014 6 <br /> improvements. Prior to moving into the next phase of this process and before preparing cost <br /> estimates, the consultant and Ramsey County would like to share with the City Council where <br /> they are at in design and collect feedback from the City Council. <br /> Tom Lincoln, Kimley Horn, reviewed the preliminary water and sanitary sewer design for the <br /> TCAAP site. He discussed the design development scenario noting that this included 1,700 <br /> residential dwelling units. He explained that the current average daily demand is 1.25 million <br /> gallons of water. The model assumes, 1.5 million gallons of water per day would be needed by <br /> the non-TCAAP part of Arden Hills. <br /> Mr. Lincoln discussed the location of the trunk water lines through the Spine Road along with the <br /> pipe sizing in the commercial and industrial areas to meet fire flows. The additional water <br /> demand is estimated to be 0.75 million gallons per day. He stated that a booster station would be <br /> required at I-694 to keep the City properly pressurized. This station would assist with serving the <br /> entire north side of the City. He stated that it looks like a 1.5 million gallon water tower will be <br /> required to service TCAAP. The sanitary sewer trunk lines were then discussed. It was noted that <br /> the City had capacity to handle the proposed system. He reported that he has held discussions <br /> with Met Council regarding the metering of the sanitary sewer system. It was determined that this <br /> would be completed through a lift station on TCAAP. <br /> Mayor Grant questioned when the cost estimates for the water and sanitary sewer systems would <br /> be completed. <br /> Mr. Lincoln anticipated that this information would be available in January. <br /> 2. COUNCIL COMMENTS AND STAFF UPDATES <br /> None. <br /> ADJOURN <br /> Mayor Grant adjourned the special City Council work session at 6:57 p.m. <br /> Amy Dietl David Grant <br /> City Clerk Mayor <br />
The URL can be used to link to this page
Your browser does not support the video tag.