My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
11-10-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 3:51:05 PM
Creation date
11/12/2014 8:30:09 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> <br />DATE: November 10, 2014 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />Patrick Klaers, City Administrator <br /> <br />FROM: Terry Maurer, Public Works Director <br /> <br />SUBJECT: TH 51 Bridge Project <br />MnDOT Signal Agreement <br /> <br />Requested Action <br /> <br />Adopt Resolution 2014-053 approving MnDOT Traffic Control Signal Agreement No. 06589 for <br />the TH 51 Bridge Project in the amount of $123,778.15. <br /> <br />Background/Discussion <br /> <br />MnDOT plans to replace the County Road E Bridge over TH51 in 2015. That project includes <br />new signals at both the east and west side ramps to and from County Road E. Although the City <br />has no cost in the new bridge there are some costs in each of the two new signals that will be a <br />City responsibility. The City has one of five legs for each signal (east/west CR E, on/off TH 51 <br />and Connelly on the east side and a private driveway on the west side) or 20% of the cost. In <br />addition, there is a 20% share for the interconnection of the two signals, the Emergency Vehicle <br />Pre-emption (EVP), painting the signal poles green and a small share for the pretreatment pond <br />and trail leaving the bridge on the west side. <br /> <br />The total estimated cost of the City’s portion is $123,778.15 (the County’s estimated share of the <br />same Agreement is $248,151.38). The City’s cost is not eligible for Municipal State Aid (MSA) <br />funding since the city legs are not on the MSA system so payment would come from the PIR <br />fund. <br /> <br />Attached is a copy of the Traffic Control Signal Agreement No. 06589 and Resolution 2014-053. <br />Staff would recommend approval of Resolution 2014-053 approving the agreement. <br /> <br />Attachments <br /> <br />Attachment A: Traffic Control Signal Agreement No. 06589 <br />Attachment B: Resolution 2014-053 <br />CONSENT ITEM – 5D <br /> <br /> <br />MEMORANDUM <br />
The URL can be used to link to this page
Your browser does not support the video tag.