Laserfiche WebLink
Page 3 of 3 <br /> <br /> <br />Miscellaneous/Retail Activities <br />The ¾” and 3” hydrant meter rental (page seven of the fee schedule) is being removed from the <br />fee schedule. Anyone needing the use of water during repair work or construction activities will <br />either use their own water truck or they will work directly with the Public Works Department. <br /> <br />Utility Rates <br />The utility rates and charges (i.e. SAC/WAC fees) proposed increase is 2%, and surface water <br />charges per quarter is a 3% proposed increase based on City Council direction given at the <br />December 10, 2012, meeting when the plan for future utility rates was approved. <br /> <br />Requested Action <br /> <br />Staff would like Council feedback on the proposed 2015 Fee Schedule. <br /> <br />Attachment <br /> <br />Attachment A: Redlined Version of Ordinance 2015-001 – Appendix A – 2015 Fee Schedule