Laserfiche WebLink
ARDEN HILLS CITY COUNCIL – OCTOBER 27, 2014 11 <br /> <br />of the primary building and where the Brownstone underground parking will be located, as <br />required by the PUD Development Agreement. The purpose of these speed bumps was to deter <br />residents from using the County Road D access driveway and to limit the amount of traffic that <br />would cut through Wheeler Avenue in Roseville. Presbyterian Homes has noted that the heavy use <br />of the County Road D access has not materialized and that the City of Roseville has taken the <br />additional step of temporarily closing off access to Wheeler Avenue from County Road D. The <br />request is to amend the PUD Development Agreement to state that upon the completion of the <br />required Wheeler Avenue and County Road D traffic study one year after the full redevelopment <br />of the site if it is determined that the three speed bumps are not necessary for traffic calming <br />purposes that Presbyterian Homes be permitted to remove them. <br /> <br />Associate Planner Bachler indicated that the Planned Unit Development process is a tool that <br />provides additional flexibility for development that an underlying zoning district would not <br />otherwise allow. For example, a PUD may make exceptions to setbacks, lot coverage, parking <br />requirements, signage, building materials, or landscaping requirements. It is intended to overcome <br />the limitations of zoning regulations and improve the overall design of a project. While the PUD <br />process allows the City to negotiate certain aspects of the development, any conditions imposed <br />on the PUD must have a rational basis related to the expected impact of the development. A PUD <br />cannot be used to permit uses that would not otherwise be permitted in the underlying zoning <br />district. <br /> <br />Associate Planner Bachler stated that in the original Master PUD approval, the City granted <br />Presbyterian Homes flexibility in terms of building height and density. The maximum building <br />height in the R-4 District is 35 feet and the Lakeview Building was permitted to be constructed at <br />an average height of 46 feet above grade. Prior to receiving approval of the Master PUD, the <br />Johanna Shores facility operated under two Conditional Use Permits, which granted approval for a <br />net density of 17.6 units per acre on the property. The maximum density in the R-4 District is 12 <br />units per acre. The Master PUD included an additional 14 units on the property, which increased <br />the approved net density for the site to 18.2 units per acre. <br /> <br />Associate Planner Bachler discussed the Plan Evaluation, Lighting Plan, and Traffic Review <br />with the Council. <br /> <br />Associate Planner Bachler explained that the Planning Commission reviewed Planning Case 14- <br />031 at their regular meeting on October 8, 2014. The Planning Commission offered the following <br />fifteen (15) findings of fact for consideration: <br /> <br />General Findings: <br />1. The property is located in the R-4 Multiple Dwelling District. <br />2. The City Council approved the Master Planned Unit Development and Final Planned Unit <br />Development Plans for the property in Planning Case 10-012 (Resolution No. 2010-067) <br />on November 29, 2010. <br />3. The PUD Development Agreement requires that any significant changes to the approved <br />plans be reviewed by the Planning Commission and approved by the City Council. <br />4. The PUD process allows for flexibility within the City’s zoning regulations through a <br />negotiated process with a developer.