My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-26-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
01-26-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2015 3:03:27 PM
Creation date
1/23/2015 2:58:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – January 7, 2015 3 <br /> <br />11. The subdivision will not involve the opening, widening or extension of any public or <br />private street, road, thoroughfare or highway and will not involve the dedication, <br />reservation or construction of any type of public utility. <br />12. The subdivision will not obstruct future streets which have been planned by the City. <br />13. The subdivision will not be detrimental to the public welfare or injurious to adjacent <br />tracts in the area in which the subdivision tract is located. <br />14. The registered land survey conforms to all requirements. <br />15. The resultant parcel at 4605 Prior Avenue will be in conformance with the Zoning Code <br />and the existing Conditional Use Permit that the property operates under. <br />16. The resultant parcel at 4703 U.S. Highway would not be in conformance with the Zoning <br />Code and a variance is needed. <br />17. A twenty (20) foot wide sanitary sewer easement will be provided across the property at <br />4703 U.S. Highway 10 where an existing sanitary sewer line is located. <br />18. No grading plan is required for the proposed subdivision. <br />19. The proposed subdivision is not subject to the City’s park dedication fee. <br /> <br />Variance Findings: <br />20. The proposal is in harmony with the purpose and intent of the Zoning Ordinance as the <br />Ordinance generally allows flexibility for unique situations when impacts to surrounding <br />properties are minimized. <br />21. The proposal is consistent with the Arden Hills Comprehensive Plan as it allows the <br />reasonable use of a residential and commercial property. <br />22. The proposed variance would have no appreciable impact on the site conditions as the <br />parking area in question has already been constructed. <br />23. The proposed subdivision and lot consolidation is unlikely to have negative impacts to <br />the property or to the neighborhood as a whole. <br />24. The proposed subdivision and lot consolidation and requested variances do not appear to <br />be based on economic considerations alone. <br /> <br />Associate Planner Bachler explained if the Planning Commission recommends approval of this <br />request, staff recommends the following three conditions: <br /> <br />1. The applicant shall file the Registered Land Survey with Ramsey County and a copy of <br />the survey shall be provided to the City within ninety (90) days of the final approval date. <br />2. The applicant shall file the twenty (20) foot wide sanitary sewer easement as depicted on <br />the approved Registered Land Survey with Ramsey County and a copy of the document <br />shall be provided to the City within ninety (90) days of the final approval date. The <br />easement document shall be approved by the City Attorney before filing with the County. <br />3. Monuments or stakes shall be placed and installed at all corners and angle points of the <br />resultant parcels. <br /> <br />Associate Planner Bachler reviewed the options available to the Planning Commission on this <br />matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted. <br />3. Recommend Denial <br />4. Table
The URL can be used to link to this page
Your browser does not support the video tag.