Laserfiche WebLink
Page 1 of 1 <br /> <br />DATE: February 23, 2015 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />Patrick Klaers, City Administrator <br /> <br />FROM: Terry Maurer, Public Works Director <br /> <br />SUBJECT: Xcel Energy Contract Lighting Installation <br />County Road E <br /> <br />Requested Action <br /> <br />Authorize the execution of the contract with Xcel Energy in the amount of $323,216.40 for the <br />installation of 28-100W HPS Vernon Fixtures on 15 foot fluted base mounted fiberglass poles <br />for the County Road E improvements. <br /> <br />Background/Discussion <br /> <br />As part of the County Road E Area improvement project it is proposed to install street lighting <br />through Xcel Energy. Through the Feasibility Report and Public Hearing process it was <br />determined to install the Vernon style fixture on a 15’ fluted base mounted fiberglass pole. A <br />photo of the light fixture is attached (the flag holder is not included for CR E) <br /> <br />Attached is the contract for the installation of the lights by Xcel Energy. The total cost for <br />installation is $323,216.40. A copy of the Xcel Energy contract is attached. Staff recommends <br />Council approval of the contract with Xcel Energy. <br /> <br />Attachment <br /> <br />Attachment A: Photo of the Vernon light <br />Attachment B: Xcel Energy Contract <br />CONSENT ITEM – 5H <br /> <br /> <br />MEMORANDUM <br />