My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-15-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
02-17-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 10:49:41 AM
Creation date
2/23/2015 10:48:50 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF ARDEN HILLS, MN <br />CONTRACT FOR THE COLLECTION OF RESIDENTIAL RECYCLABLE MATERIALS Page 6 <br />Solid Waste Garbage, rubbish and other discarded solid materials (except animal <br />waste used as a fertilizer), including solid waste materials resulting from <br />industrial, commercial and agricultural operations, and from community <br />activities. Solid waste does not include earthen fill, boulders, rock and <br />other material normally handled in construction operations, solids or <br />dissolved material in domestic sewage or other significant pollutants in <br />waste resources, such as silt, dissolved or suspended solids in industrial <br />waste water effluents, dissolved materials in irrigation return flows, or <br />other common water pollutants. For purposes of this Contract, solid <br />waste does not include recyclables, yard waste, source separated <br />organics, bulky items, appliances or electronic waste. (Also referred to <br />as “mixed municipal solid waste”) <br /> <br />Source Separated <br />Organics (SSO) <br />Food waste, non-recyclable paper, house plants, and other household <br />organics designated by the City that, once separated by residents, may be <br />recovered for composting or other forms of organics recovery. SSO does <br />not include yard waste for purposes of this Contract. <br /> <br />Steel cans Metal containers fabricated primarily of steel and/or tin used to contain <br />food or beverages. <br /> <br /> <br />3 Scope of Work: General Provisions <br />3.1 The work under the Contract shall consist of all the items contained in the Contract, including <br />all the supervision, materials, equipment, labor, customer service operations, and all other items <br />necessary to complete such work in accordance with the Contract. <br /> <br />3.2 The City’s RFP (including all addenda) and Contractor’s proposal (including responses to City <br />questions) are incorporated by reference into this final Contract. If there is any discrepancy <br />between this final Contract and the City’s RFP or the Contractor’s proposal, this final Contract <br />shall take precedence. <br /> <br />3.3 Comprehensive recycling services will be provided to all RDU’s, with opportunities for MDU <br />buildings to “opt-in” to the service. Recyclables collection will occur weekly on Tuesdays for <br />properties south of I-694 and on Wednesdays for properties north of I-694. Appendix A includes <br />a map of route sectors by collection day. <br /> <br />3.4 The Contractor will acquaint itself with all pertinent City Ordinances and other City guidelines <br />and comply with said ordinances and guidelines. <br /> <br />3.5 The Contractor has made its own examination, investigation and research regarding the proper <br />method of doing the work, and all conditions affecting the work to be done (including street <br />layout, alley layout, overhead obstructions preventing automated lifting of carts, other <br />geography, daily route sector boundaries, etc.) and the labor, equipment and materials needed <br />thereon, and the quantity of work to be performed (including the Contractor’s own field <br />verification of RDU and MDU estimates provided by the City), and the Contractor agrees that it <br />has satisfied itself by its own investigation and research regarding all of such conditions, and <br />that this conclusion to enter into the proposed Contract is based upon such investigation and
The URL can be used to link to this page
Your browser does not support the video tag.