My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
03-09-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2015 2:26:03 PM
Creation date
3/6/2015 2:23:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Phase III will include a building on Lot 3, Block 1, Arden Plaza in addition to the existing <br />Arden Plaza retail building located on Lot 3. <br />NOW, THEREFORE, the parties hereby agree as follows: <br /> <br />1. APPROVAL. The City Council approves the following: <br />A. The PUD-Master Plan for Lots 1-3, Block 1, Arden Plaza; <br />B. The combined preliminary/final plat (“Final Plat”) of Arden Plaza; <br />C. PUD-Final Plan for Lot 1, Block 1, Arden Plaza; <br />D. The PUD-Master Plan, the Final Plat and PUD-Final Plan are illustrated and <br />described on the following documents attached and incorporated herein: <br /> <br />1. Cover Sheet, dated May 4, 2009 as revised on May 22, 2009; <br />2. Cover Sheet (Phase I), dated June 6, 2011 <br />3. Boundary and Topographic Survey, dated May 4, 2009 as revised on May <br />22, 2009; <br />4. Tree Preservation Plan, dated May 4, 2009 as revised on May 22, 2009; <br />5. Arden Plaza Preliminary Plat, dated June 30, 2011; <br />6. Circulation Plan, dated May 4, 2009 as revised on May 22, 2009; <br />7. Site Plan, dated May 4, 2009 as revised on May 22, 2009; <br />8. Preliminary Site Plan (Phase I), dated June 6, 2011, as modified by <br />Preliminary Site Plan prepared by Westwood Professional Services, Inc. <br />dated September 22, 2011; <br />9. Grading and Erosion Control Plan, dated May 4, 2009 as revised on May <br />22, 2009; <br />10. Preliminary Grading and Drainage Plan (Phase I), dated June 6, 2011; <br />11. Utility Plan, dated May 4, 2009 as revised on May 22, 2009; <br />12. Preliminary Utility Plan (Phase I), dated June 6, 2011; <br />4 <br />174869v10
The URL can be used to link to this page
Your browser does not support the video tag.