Laserfiche WebLink
ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION—MARCH 30, 2015 3 <br /> Mr. Lamb discussed how multi-family developments were being constructed in the metro area. <br /> He believed that convenient retail services were driving higher rental rates. <br /> Councilmember Holden suggested that staff consider how the AHATS parcel could be <br /> connected into the TCAAP site in the future, if the parcel became available for redevelopment. <br /> Mr. Lamb stated that the current plan does not take this into consideration. <br /> Mayor Grant inquired how part two of the Fit Test would differ from part one. <br /> Mr. Lamb explained how part two of the Fit Test would differ from part one. He reported that <br /> the open and common space would be addressed, and in addition, visual connections would be <br /> further described. He elaborated on the pros and cons of the site from a development perspective. <br /> Councilmember Holden asked if a grid system would be considered or if the City should move <br /> away from this on TCAAP. <br /> Mr. Lamb stated that he would lay out the development with a 400-foot block design per the <br /> TRC; however, this could be lengthened to 600 feet for some blocks. <br /> Councilmember McClung questioned if option two would have approximately the same density <br /> as Option 1. <br /> Mr. Lamb anticipated that Option 2 would have a higher density. It was his hope to create a plan <br /> that would make the best use of the space. He believed that the proposed numbers in Option 1 <br /> were fair. He explained that he would be back in several weeks with phase two of the Fit Test. <br /> Mayor Grant thanked Mr. Lamb for his presentation and stated that he looked forward to <br /> reviewing the Fit Test further on April 131h <br /> 2. COUNCIL COMMENTS AND STAFF UPDATES <br /> None. <br /> ADJOURN <br /> Mayor Grant adjourned the special City Council work session at 6:50 p.m. <br /> J"� a' <br /> Amy Dietl David Grant <br /> City Clerk Mayor <br />