My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-30-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
03-30-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2015 4:33:58 PM
Creation date
3/27/2015 4:19:33 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RCWDPermitNumber14-105 <br />Administrative <br />2. Sendonefinal, signedfullsizedplansettotheDistrict, ande-mailapdfcopytoboththeDistrict <br />andtheDistrictEngineer. Includealistofchangesthathavebeenmadesinceapprovalbythe <br />RCWDBoard. <br />3. IfrequiredbytheCityofArdenHills, theapplicantmustsubmitadraftlegaldocumentproviding <br />satisfactory formanddescriptiongrantingpondingandflowageeasementsoverallonsiteponds, <br />wetlands, andotherhydrologicfeatures. <br />4. TheapplicantmustsubmitaDraftDeclarationforMaintenance ofStormwaterManagement <br />FacilitiesacceptabletotheDistrictforproposedonsitestormwatermanagement andpretreatment <br />features. <br />5. TheapplicantmustsubmitacopyofreceiptfromCountyRecorderandsigned/notarizedattested <br />legaldocument(s). <br />6. Theapplicantmustsubmitasurety $5,700alongwithanoriginalexecuted escrowagreement <br />acceptabletotheDistrict. Iftheapplicantdesiresanoriginal copyfortheirrecords, thentwo <br />originalsignedescrowagreementsshouldbesubmitted. Theapplicantmustprovidethefirst <br />5000intheformofacheckandhastheoptionofprovidingtheremainderofthesuretyamount <br />intheformofacheckoraPerformance BondorLetterofCredit. <br />Stipulations: Thepermitwillbeissuedwiththefollowingstipulationsasconditionsofthepermit. By <br />acceptingthepermit, applicantagreestothesestipulations: <br />1. Anas-builtsurveyofallstormwaterBMPs (ponds, raingardens, trenches, swales, etc.) istobe <br />submittedtotheDistrictforverificationofcompliancewiththeapprovedplansbeforereturnofthe <br />surety. <br />Exhibits: <br />1. Plansetcontainingsheets1-3of5, datedandreceived2-6-2015. <br />2. AltaSurvey (sheetAA-1), datedandreceived1-2-2015. <br />3. Permitapplicationwithoriginalsignature, dated12-19-2014andreceived12-22-2014. <br />4. Permitapplication checklist, nodate, received1-2-2014. <br />5. StormwaterCalculations, dated11-3-2014andreceived 12-19-2014, containing narrative, <br />drainagemaps, HydroCAD reportforthe2-year, 10-year, 100-yearrainfalleventsforproposed <br />andexistingconditionsandthegeotechnicalreport (dated11-3-2014). <br />6. RevisedStormwaterCalculations, dated1-2-2015andreceived1-9-2015, containingnarrative; <br />drainagemaps; HydroCAD reportforthe2-year, 10-year, 100-yearrainfalleventsforproposed <br />andexistingconditions; thegeotechnicalreport (dated11-3-2014). <br />7. RevisedStormwaterCalculations, dated1-22-2015andreceived1-23-2015, containingnarrative, <br />drainagemaps, HydroCAD reportforthe2-year, 10-year, 100-yearrainfalleventsforproposed <br />conditionsandthe2-yearrainfall eventforexistingconditionsandthegeotechnicalreport (dated <br />11-3-2014); wetlanddelineationreport (dated10-17-2014), anddrainageeasementdocument <br />dated3-25-1980). <br />8. RevisedStormwaterCalculations, dated andreceived1-30-2015, containing narrative, drainage <br />maps, HydroCAD reportforthe2-year, 10-year, 100-yearrainfalleventsforproposed conditions <br />HoustonEngineering Inc Page2of4 2/25/2015
The URL can be used to link to this page
Your browser does not support the video tag.