Laserfiche WebLink
City council in care of Inspection Department. <br />I am proposing a fee schedule change effective 7-1-15 for the following reasons: <br />1. Simplification of fee calculations: <br /> A. Simplified the transformers and generator calculations. <br /> B. Simplified the panel and sub panel replacement fee calculation. <br />2. Reduction of OFPs <br /> A. Changed new house permits to include 3 inspections of any kind Rough-in final or <br />reinspection. <br />3. An approximate fee increase of 6%. <br />4. The fees were established in 2010. Cost of living has increased by about 7% to 8% in that time-frame, <br />with a corresponding increase in costs (supplies, labor, insurance). <br />Peter Tokle <br />Tokle Inspections Inc. <br />