My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-30-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
03-30-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2015 4:33:58 PM
Creation date
3/27/2015 4:19:33 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
180304 <br />n. L2 – Tree Mitigation Plan – 1/29/15 <br />o. L3 – Landscaping Plan – 1/29/15 <br />p. L4 – Landscape Detail – 1/29/15 <br />q. Landscaping & Parking Areas – 1/9/15 <br />r. A1.1 – Architectural Site Plan – 1/26/15 <br />s. A2.1 – Floor Plan Building 1 – 1/26/15 <br />t. A2.2 – Floor Plan Building 2 – 1/26/15 <br />u. A3.1 – Exterior Elevations Building 1 – 12/12/14 <br />v. A3.2 – Exterior Elevations Building 2 – 12/12/14 <br />2. Conditional Use Permit <br />3. Façade materials and color pallet: <br /> <br />The front and side elevations of building 1 & 2 will consist of two (2) <br />complimentary tan/brown earthtone colors shown on the submittal plan as <br />Precast Panels A & C. Precast Panel B will be a greyish/black panel made up of <br />either revealed panels, or thin brick panels which will add architectural detail at <br />the window locations. The rear elevation will consist of two (2) different colored <br />precast panels to match Precast Panels A & C., plus an optional 3rd door <br />color, which will all be similar to the colors used on the front of the building. <br />4. Written Statement consisting of pages 1-2 dated 1/26/2015. <br /> <br />C. Subject to the conditions and modifications contained herein, the Development Plan <br />Documents represent the nature, scope and configuration of the development Project which the Developer <br />is requesting the City to approve. <br />D. The PUD-Master Plan and the Conditional Use Permit Documents indicate that the <br />Property will be developed in a single phase comprised of two buildings, one of 43,300 square feet and <br />the other of 50,000 square feet. <br />2. CITY PLANNING COMMISSION REVIEW AND RECOMMENDATION. On the <br />4th day of February, 2015, the City Planning Commission reviewed the application at a public hearing <br />and after considering the application, the reports and comments of the City’s staff and consultants, reports <br />and comments of the Developer, and other public comments; and, subject to conditions, recommended <br />approval of the PUD Master Plan and Final Plan; and the Conditional Use Permit.
The URL can be used to link to this page
Your browser does not support the video tag.