Laserfiche WebLink
Solar <br />•Primer Tracer PV <br />–~ 40-60 acres available <br />–~ 8-12 of MW electricity <br />•Additional PV <br />–Areas on AHATS with <br />contaminated soils and <br />limited training usage <br />–1-2 MW of electricity <br />•Future possible solar <br />thermal integration <br />