My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2015
>
02-23-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 12:14:29 PM
Creation date
4/28/2015 12:14:20 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—FEBRUARY 23, 2015 11 <br /> evaluate items such as grading, landscaping requirements, and parking lot setbacks in detail. <br /> Boston Scientific expects to apply for a Site Plan Review in Fall 2015 or Spring 2016 to complete <br /> the necessary site modifications to demarcate the properties. <br /> City Planner Streff noted that the Campus Master Plan also indicates a future second access <br /> drive for Lot 1 on Hamline Avenue,just north of the existing entrance to this site. The new access <br /> is not being evaluated as part of this proposal. Boston Scientific has included this access drive as a <br /> possible option for a future property owner or tenant on the site depending on their needs. <br /> Construction of this access would require a Site Plan Review as well as approval through the <br /> Ramsey County Public Works Department. Ramsey County has reviewed the Campus Master <br /> Plan. <br /> City Planner Streff indicated that the development plans for the Boston Scientific Campus would <br /> be phased over the next 20 years. The construction of new buildings and parking ramps will be <br /> coordinated with the future growth of Boston Scientific Corporation. As is the case with the <br /> existing PUD, new building construction or site modifications identified on the approved Campus <br /> Master Plan will require the submittal of a Site Plan Review for City Council approval prior to <br /> construction. Proposed construction or site modifications not conforming to the approved Campus <br /> Master Plan would require an amendment to the PUD. This requirement would apply to both Lot <br /> I and Lot 2. <br /> City Planner Streff discussed the Plan Review, and offered the following Findings of Fact for <br /> consideration: <br /> 1. The applicant has requested approval of a Preliminary and Final Plat and an amendment to <br /> the PUD for the property at 4100 Hamline Avenue North. <br /> 2. The subdivision would create two new parcels (Lot 1 and Lot 2) within the existing <br /> Boston Scientific Campus plat. <br /> 3. The proposed subdivision is in conformance with the Subdivision Ordinance in Chapter 11 <br /> of the Arden Hills City Code. <br /> 4. A Master PUD was approved for 4100 Hamline Avenue North in Planning Case#02-025. <br /> 5. The applicant has requested an amendment to the PUD to reflect the change in the <br /> property boundaries, to update the Campus Master Plan, and to create a separate PUD for <br /> the proposed Lot 1. <br /> 6. The PUD process allows for flexibility within the City's regulations through a negotiated <br /> process with a property owner. <br /> 7. Lot 1 and Lot 2 are located in the I-1 Limited Industrial Zoning District. <br /> 8. The proposed uses on Lot 1 and Lot 2 are permitted uses in the I-1 District. <br /> 9. The revisions to the Campus Master Plan are in substantial conformance with the original <br /> PUD approval granted by the City in Planning Case#02-025. <br /> 10. The PUD amendment is in substantial conformance with the requirements of the City's <br /> Zoning Code. <br /> 11. Where the plan is not in conformance with the City's Zoning Code, flexibility has been <br /> requested by the applicant and/or conditions have been placed on the approval that would <br /> mitigate the nonconformity. <br /> 12. The PUD amendment would grant flexibility for Lot 1 in terms of building height, front <br /> yard setback, and the number of principal buildings allowed on a lot. <br />
The URL can be used to link to this page
Your browser does not support the video tag.