My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2015
>
02-23-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 12:14:29 PM
Creation date
4/28/2015 12:14:20 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—FEBRUARY 23, 2015 14 <br /> City Planner Streff stated that the City approved a redevelopment plan for the Arden Plaza retail <br /> center in 2009 in Planning Case 09-011. The approved Master PUD included the demolition of an <br /> existing office building, the subdivision of the parcel into four lots, and the construction of four <br /> new buildings over three phases. A total of 97,035 square feet of retail and commercial building <br /> space was approved for the Master PUD. Phase I of the PUD, which included the development of <br /> a pharmacy in place of the office building at the intersection of Lexington Avenue and County <br /> Road E, was also approved as part of this planning case. <br /> City Planner Streff indicated that a subsequent PUD Amendment in 2011 (Planning Case 11- <br /> 016) included a revised plat that combined two of the lots in the northeast corner of the site into a <br /> single lot for the development of the existing Walgreens Pharmacy. Phase I of the Master PUD <br /> was largely completed in 2012, and included the construction of the Walgreens building, <br /> modifications to parking and circulation within the retail center area, and the construction of <br /> stormwater bio-filtration basins required for the proposed build-out of the site. <br /> City Planner Streff explained that a Conditional Use Permit (CUP) was approved in Planning <br /> Case 97-009 allowing Frattallone's Hardware to install fencing on a portion of the retail center <br /> parking lot for a seasonal garden sales area. A CUP was required because the Zoning Code does <br /> not specifically allow or prohibit outdoor garden sales as a use. This seasonal sales area continues <br /> to operate on the property, although the area was never fenced off as proposed and its footprint <br /> has expanded beyond the original CUP approval. <br /> City Planner Streff commented that the Master PUD and subsequent amendment, along with <br /> associated plans and conditions of approval, remain valid. Neither Phase II nor Phase III of the <br /> approved Master PUD is being reviewed as part of this amendment request. The buildings <br /> included in these future phases would return to the Planning Commission and City Council for <br /> review and approval prior to development. <br /> City Planner Streff noted that the first component of the application is the Preliminary Plat to <br /> subdivide Lot 3 within the existing Arden Plaza plat into three separate parcels. Frattallone's <br /> Hardware, which is a current tenant in the retail center, has approached Wellington Management <br /> regarding the purchase of its store and the existing outdoor garden center. To accommodate this, a <br /> new Lot 4 would be created comprised of the Frattallone's portion of the building, the area <br /> occupied by the seasonal sales area, and related parking and service areas. <br /> City Planner Streff stated that the new Lot 3 would be comprised of the remaining retail center, <br /> the primary parking area, access drives on County Road E and Lexington Avenue, and the <br /> stormwater pond at the southeast corner of the site. The lot line between the retail building on Lot <br /> 3 and the Frattallone's Hardware store on Lot 4 would be defined by a demising wall, which is a <br /> common wall used by separate real estate entities erected upon a line dividing two parcels of land. <br /> The City Building Official has been working with the property owner on the specifications of the <br /> demising wall and building permits will be required prior to construction. Approval of the Final <br /> Plat will be conditioned on the issuance of a Certificate of Occupancy for the proposed <br /> remodeling work. The Final Plat will be brought back to the City Council for approval once the <br /> Certificate of Occupancy has been issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.