My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-04-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
05-04-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2015 8:27:27 AM
Creation date
4/30/2015 8:26:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. All of the proposed lots must contain suitable area meeting all established setback <br />requirements to allow the construction of single family residences. <br /> D. The Developer is required to submit the final plat in electronic format. The electronic <br />format shall be either AutoCAD.DWG file or a .DXF file. All construction record drawings (e.g., grading, <br />utilities, streets) shall be in electronic format in accordance with standard City specifications. The Developer shall <br />also submit one complete set of reproducible construction plans on mylar. <br /> <br /> 21. ESTIMATED COST OF IMPROVEMENTS. <br /> CONSTRUCTION COSTS: Amount <br />a. Sanitary Sewer $ 7,325.00 <br />b. Water Main $ 32,500.00 <br />c. Grading & Erosion Control $ 38,475.38 <br />d. Retaining Walls $ 53,650.00 <br />e. Driveways & Street Connections $ 13,731.50 <br />f. Underground Utilities $ 0.00 <br />g. Stormwater Filtration System $ 30,777.50 <br />h. Landscaping $ 41,346.00 <br /> CONSTRUCTION SUB-TOTAL $ 217,805.38 <br /> <br />22. TOTAL SECURITIES, ESCROWS AND CASH REQUIREMENTS: <br />a. Financial Surety in the amount of 125% of <br />estimated cost of site improvements <br />(Section 21 a-g) $ 220,574.22 <br />b. Financial Surety in the amount of 125% of <br />estimated cost of landscaping improvements <br />(Section 21 h) $ 51,682.50 <br />c. Cash Escrow in the amount of 25% of <br />estimated cost of site improvements <br />(Section 21 a-g) $ 44,114.84 <br />d. Cash Escrow in the amount of 25% of <br />estimated cost of landscaping improvements <br />(Section 21 h) $ 10,336.50 <br />e. Park Dedication $ 51,360.00 <br /> <br /> <br />8 <br />181229v1
The URL can be used to link to this page
Your browser does not support the video tag.