My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-06-15-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2015
>
05-06-15-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2015 10:26:09 AM
Creation date
5/1/2015 10:21:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
diffuse and dim the lighting. The light fixtures would be placed along the entire length of the <br />building roofline and along the top edge of the canopy. Photographs of the existing conditions on <br />the site and where the accent lights would be installed are included in Attachment C. The <br />applicant has provided details on the specific product that would be used and photographs of the <br />lighting installed at a Holiday services station in Bloomington, Minnesota (Attachments D & E). <br /> <br />An amendment to the PUD is required in this case to update the building and canopy elevations <br />for the approved PUD. Flexibility has been requested through the PUD process because the <br />proposed accent lighting does not conform to the City Code regulations on exterior lighting. The <br />accent lighting creates glare that would impact cars driving on adjoining public streets and <br />properties within residential districts. The service station canopy would also be illuminated <br />beyond what is permitted by the Sign Code. <br /> <br />The applicant has provided a narrative on how the visual impacts of the proposed accent lights <br />would be minimized through the design of the product (Attachment A). The narrative also notes <br />that the proposed accent lights are made by a different manufacturer than the LED lighting which <br />is now installed on the monument sign located on the property. <br /> <br /> <br />2. Planned Unit Development (PUD) Process: <br /> <br />The Planned Unit Development process is a tool that provides additional flexibility for <br />development that an underlying zoning district would not otherwise allow. For example, a PUD <br />may make exceptions to setbacks, lot coverage, parking requirements, signage, building <br />materials, or landscaping requirements. It is intended to overcome the limitations of zoning <br />regulations and improve the overall design of a project. While the PUD process allows the City <br />to negotiate certain aspects of the development, any conditions imposed on the PUD must have a <br />rational basis related to the expected impact of the development. A PUD cannot be used to <br />permit uses that would not otherwise be permitted in the underlying zoning district. <br /> <br /> <br />3. Surrounding Area <br />Direction Future Land Use Plan Zoning Existing Land Use <br />North Medium Density <br />Residential <br />R-3: Townhouse & Low Density <br />Multiple Dwelling District Manufactured Home Park <br /> <br />South <br /> <br />Light Industrial and Office G-B: Gateway Business District Light Industrial <br />East Water (Round Lake), <br />Low Density Residential <br />Water (Round Lake), <br />R-1: Single-Family Residential <br />Water (Round Lake), Single- <br />Family Detached Residential <br />West <br /> <br />Right-of-Way <br />(Interstate 35W) <br />Right-of-Way <br />(Interstate 35W) <br />Right-of-Way <br />(Interstate 35W) <br /> <br /> <br />City of Arden Hills <br />Planning Commission Meeting for May 6, 2015 <br />P:\Planning\Planning Cases\2015\PC 15-008 - Holiday Station - PUD Amendment\Memos_15-008 <br /> <br />Page 2 of 8
The URL can be used to link to this page
Your browser does not support the video tag.