Laserfiche WebLink
Pr <br />o <br />p <br />o <br />s <br />e <br />d <br /> <br />R <br />e <br />m <br />o <br />d <br />e <br />l <br />i <br />n <br />g <br /> <br />F <br />o <br />r <br />: <br />Ca <br />r <br />i <br />b <br />o <br />u <br /> <br />C <br />o <br />f <br />f <br />e <br />e <br />Sh <br />a <br />n <br />n <br />o <br />n <br /> <br />S <br />q <br />u <br />a <br />r <br />e <br /> <br />S <br />h <br />o <br />p <br />p <br />e <br />s <br />36 <br />7 <br />3 <br /> <br />L <br />e <br />x <br />i <br />n <br />g <br />t <br />o <br />n <br /> <br />A <br />v <br />e <br /> <br />N <br />o <br />r <br />t <br />h <br />, <br /> <br />S <br />u <br />i <br />t <br />e <br /> <br />A <br />Ar <br />d <br />e <br />n <br /> <br />H <br />i <br />l <br />l <br />s <br />, <br /> <br />M <br />N <br />04-01-2015 <br />Landscape Architecture Environmental <br />Planning Civil Engineering Land Surveying <br />7200 Hemlock Lane - Suite 300 <br />Maple Grove, MN 55369 <br />Telephone: (763) 424-5505 <br />www.LoucksAssociates.com <br />Jonathan J. Donovan - PE <br />44613 <br />License No.Date <br />--/--/-- <br />I hereby certify that this plan, specification <br />or report was prepared by me or under <br />my direct supervision and that I am a duly <br />Licensed Professional Engineer under the <br />laws of the State of Minnesota. <br />C3-1 <br />GRADING <br />DRAINAGE AND <br />EROSION <br />CONTROL PLAN <br />N <br />Gopher State One Call <br />WARNING: <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL <br />EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN <br />MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. <br />THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT <br />LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, <br />CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE <br />DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED <br />DURING CONSTRUCTION AT NO COST TO THE OWNER. <br />GRADING, DRAINAGE & EROSION CONTROL NOTES <br />1.THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR EXACT <br />LOCATIONS AND DIMENSIONS OF BUILDINGS, VESTIBULES, SLOPED PAVING, EXIT <br />PORCHES, RAMPS, TRUCK DOCKS, ENTRY LOCATIONS AND LOCATIONS OF <br />DOWNSPOUTS. <br />2.ALL DISTURBED UNPAVED AREAS NOT IN PLANTING BEDS ARE TO RECEIVE MINIMUM <br />OF 4 INCHES OF TOP SOIL AND SOD. THESE AREAS SHALL BE WATERED BY THE <br />CONTRACTOR UNTIL THE SOD IS GROWING IN A HEALTHY MANNER. <br />3.THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY <br />DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASE OF THIS <br />PROJECT. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGES TO <br />ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASE OF THIS <br />PROJECT. <br />4.THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING <br />TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL <br />SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE <br />NECESSARY. PLACEMENT OF THESE DEVICES SHALL BE APPROVED BY THE ENGINEER <br />PRIOR TO PLACEMENT. TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE <br />APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. <br />5.IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE <br />CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS <br />ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE <br />PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY <br />AND NOT BE LIMITED TO NORMAL WORKING HOURS. <br />6.THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION <br />REVIEW OF THE CONTRACTORS PERFORMANCE IS NOT INTENDED TO INCLUDE <br />REVIEW OF THE ADEQUACY OF THE CONTRACTORS SAFETY MEASURES IN, OR NEAR <br />THE CONSTRUCTION SITE. <br />7.EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE ESTABLISHED <br />AROUND THE ENTIRE SITE PERIMETER AND IN ACCORDANCE WITH NPDES PERMIT <br />REQUIREMENTS, BEST MANAGEMENT PRACTICES, CITY REQUIREMENTS AND THE <br />DETAILS SHOWN ON SHEET C-8 OF THE PROJECT PLANS. <br />8.ALL ENTRANCES AND CONNECTIONS TO CITY STREETS SHALL BE PERFORMED PER <br />THE REQUIREMENTS OF THE CITY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />ALL PERMITS AND NOTIFICATIONS AS REQUIRED BY THE CITY. <br />9.SEE UTILITY PLAN AND STORM SEWER PROFILES FOR FURTHER DETAIL REGARDING <br />THE STORM SEWER. <br />