|
PUD Amendment
<br />5 January, 2015
<br />Boston Scientific Corporation
<br />4100 N Hamline Avenue
<br />Arden Hills, MN 55112
<br />DETAILED BUILDING / PARKING RAMP INFORMATION - 2002 PUD
<br />Bldg/Ramp Identification Bldg Area Lot Coverage Landscape Area Height Pkg. Stalls
<br />(letter or number)(square feet)(square feet)(square feet)(Note 1)
<br />P = Penthouse
<br />Existing Buildings
<br />A, B, C, D, E 450,893 232,000 957,100 57 / 3+P
<br />F 673,000 306,000 584,700 46 / 3+P
<br />O (old Nestle property)35,000 35,000 200,958 40
<br />Subtotal 1,158,893 573,000 1,742,758
<br />Proposed New Bldgs/Add'n
<br />G 150,000 50,000 60 / 3+P
<br />H 102,000 34,000 60 / 3+P
<br />I 52,600 26,300 30 / 2
<br />J 80,000 40,000 30 / 2
<br />K 259,200 38,700 135 / 8+P
<br />L 108,000 36,000 62 / 3+P
<br />M 138,600 34,650 75 / 4+P
<br />N 138,600 34,650 75 / 4+P
<br />Subtotal 1,029,000 294,300 413,664
<br />Parking Ramps/Surface Pkg.
<br />Surface (+/-)615
<br />1 51,500 600
<br />2 51,500 750
<br />3 36,000 400
<br />4 88,300 1,335
<br />5 51,500 900
<br />6 51,500 900
<br />7 118,000 2,142
<br />Subtotal 448,300 7,642
<br />Totals (Campus Master Plan)2,187,893 1,315,600 2,156,422 7,642
<br />Note 1: Feet above grade to highest point of structure / total number of stories.
<br />(2 levels below grade) 30 / 5
<br />(2 levels below grade) 40 / 6
<br />(2 levels below grade) 40 / 6
<br />(2 levels below grade) 40 / 6
<br />(1/2 level below grade) 40 / 4
<br />(1/2 level below grade) 50 / 5
<br />(1 level below grade) 30 / 4
|