My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-04-15-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2015
>
02-04-15-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2015 3:48:40 PM
Creation date
5/1/2015 3:39:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. P:\PR&PW\Numbered Projects\PW-14-0110 Roberts redfox\01-27-15 plan review.doc <br /> <br />Page 1 of 2 <br /> MEMORANDUM <br /> <br />DATE: January 27, 2015 <br /> <br />TO: Ryan Streff, City Planner <br /> <br />FROM: John M. Anderson, Assistant City Engineer <br /> <br />SUBJECT: Red Fox Business Center <br /> <br /> <br /> <br />I have reviewed the revised civil plans for the Red Fox Business Center. The plans were <br />prepared by Larson Engineering Inc. and are dated 01-26-15. <br /> <br /> The following are my revised comments: <br /> <br />1. The driveway connection to Northwoods Drive leaves no place for city public works <br />to pile snow and is unacceptable as proposed. <br /> <br />2. The side slopes adjacent to the pond are shown to be graded at 2:1 this slope cannot <br />be maintained and therefore is unacceptable as proposed. <br /> <br />3. The grading around the adjacent property to the west shows grading on the adjacent <br />property. The developer will need to provide written permission from the adjacent <br />land owner to allow for this work. (no change) <br /> <br />4. Each building needs to be served by a separate sewer service connected to a public <br />sewer or provide a recorded document describing the ownership and maintenance of <br />the shared system.(No change) <br /> <br />5. Each building needs to be served by a separate water service connected to a public <br />watermain or provide a recorded document describing the ownership and <br />maintenance of the shared system. (No Change) <br /> <br />6. Proposed trees over the sewer and water services are not recommended future <br />maintenance problems are the responsibility of the property owner. <br /> <br />7. Provide a permit or letter from MnDot approving discharge to MnDot right of way <br />as proposed in your site plan.(No Change) <br /> <br />8. Provide Rice Creek Watershed District Approval (No Change) <br /> <br />9. A City issued Grading and Erosion Control Permit is required, a cash escrow of is <br />$33,075 is required for this permit. A grading asbuilt must be completed and <br />approved prior to issuance of certificate of occupancy. (No Change) <br />
The URL can be used to link to this page
Your browser does not support the video tag.