Laserfiche WebLink
<br />City of Arden Hills <br />Economic Development Commission March 4, 2015 <br /> <br />Page 2 of 2 <br /> <br /> <br />Discussion Questions <br /> <br />The EDA has requested EDC feedback on the design and location (if any) of future signs from a <br />business perspective. A map showing the EDC’s original priority gateway sign locations is <br />attached. <br />1. Does the EDC have feedback regarding the design of the existing signs? <br />2. Should additional gateway signs be installed? If so, what are priority locations? <br /> <br /> <br />Attachments <br /> Photos/graphics of existing gateway signs <br /> Map of priority gateway sign locations