My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-11-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
05-11-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2015 10:17:37 AM
Creation date
5/8/2015 11:42:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL – MARCH 30, 2015 11 <br /> <br />Associate Planner Bachler stated that the City Attorney has reviewed the course of action being <br />proposed by staff for City Council consideration of Planning Case 15-002 and concurs with the <br />staff recommendation. <br /> <br />Associate Planner Bachler commented that the first component of the application is the <br />Preliminary Plat to subdivide Lot 3 within the existing Arden Plaza Plat into three separate <br />parcels. The proposed Final Plat name for the subdivision would be Arden Plaza 2nd Addition. <br />Frattallone’s Ace Hardware, which is a current tenant in the retail center, has approached <br />Wellington Management regarding the purchase of its store and the existing outdoor seasonal <br />sales area. To accommodate this, Lot 3, Arden Plaza 2nd Addition would be created comprised of <br />the Frattallone’s portion of the building, the area now occupied by the seasonal sales area, and <br />related parking and service areas. <br /> <br />Associate Planner Bachler indicated that the second lot created by the subdivision, Lot 2, Arden <br />Plaza 2nd Addition, would be comprised of the remaining retail center, the primary parking area, <br />access drives on County Road E and Lexington Avenue, and the stormwater pond at the southeast <br />corner of the site. The lot line between the retail center on Lot 2, Arden Plaza 2nd Addition and <br />the Frattallone’s Ace Hardware store on Lot 3, Arden Plaza 2nd Addition would be defined by a <br />demising wall, which is a common wall used by separate real estate entities erected on a line <br />dividing two parcels of land. The City Building Official has been working with the property <br />owner on the specifications of the demising wall and building permits will be required prior to <br />construction. Approval of the Final Plat will be conditioned on the issuance of a Certificate of <br />Occupancy for the proposed remodeling work. The Final Plat will be brought back to the City <br />Council for approval once the Certificate of Occupancy has been issued. <br /> <br />Associate Planner Bachler explained that the third lot, Lot 1, Arden Plaza 2nd Addition, is <br />located on Lexington Avenue and would include the future Building #4, which is proposed to be <br />constructed in Phase III of the redevelopment. The proposed footprint of Building #4 has <br />increased from the approved Master PUD. The submitted master site plan indicates that this <br />building would be 20,136 square feet in size, an increase of 2,136 square feet from the 2009 PUD <br />approval. <br /> <br />Associate Planner Bachler reported Wellington Management is requesting an amendment to the <br />Master PUD to address the following four items: <br /> <br />1. Account for the subdivision of Lot 3 within the existing Arden Plaza Plat into three <br />separate lots. <br />2. Allow for the creation of a non-conforming parcel (Lot 3, Arden Plaza 2nd Addition) that <br />does not have frontage on a public street. <br />3. Increase the size of Building #4 on the proposed Lot 1, Arden Plaza 2nd Addition from <br />18,000 square feet, as approved in Planning Case 09-011, to 20,136 square feet. <br />4. Modify the parking lot layout in the Master Site Plan to retain 12 existing parking stalls at <br />the north end of the retail center and accurately account for the outdoor seasonal sales area <br />footprint approved in Planning Case 97-009. <br /> <br />Associate Planner Bachler reviewed the Plan Evaluation in detail with the Council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.