My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-11-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
05-11-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2015 10:17:37 AM
Creation date
5/8/2015 11:42:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Arden Plaza shall install evergreen plantings along the west property line <br />of Lot 3, Arden Plaza 2nd Addition to provide additional screening of the trash and recycling <br />collection area associated with the Frattallone’s Ace Hardware portion of the retail center <br />building. <br />4. The City currently holds a Letter of Credit (American Bank Letter of <br />Credit No. 2527) for the patching and seal coating of the parking lot next to the Frattallone’s <br />Hardware store. Arden Plaza shall complete these improvements by September 30, 2015 or the <br />LOC maturity date shall be extended. <br />5. Arden Plaza shall construct the main parking area and landscaping <br />improvements previously planned for Phase I prior to the issuance of a Certificate of Occupancy <br />for either Building #2 or Building #4. <br />D. Previous Agreements. The applicant shall continue to abide by the conditions of <br />all previous Development Agreements, Master PUD and Final PUD for Phase I approvals, <br />permits, and reviews, except as hereinafter amended. <br />E. Required Improvements. The project shall be completed in accordance with the <br />submitted plans as amended by the conditions of approval. Any significant changes to these <br />plans, as determined by the City Planner, shall require review and approval by the Planning <br />Commission and City Council. <br />F. Required Permits. The applicant shall obtain all necessary permits, including <br />but not limited to, NPDES, Rice Creek Watershed District, Ramsey County, and City Grading <br />and Erosion Control Permits. Copies of all necessary permits shall be submitted to the City prior <br />to the issuance of any development permits. <br />181284v2 7
The URL can be used to link to this page
Your browser does not support the video tag.