My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
May 2015
ArdenHills
>
Communications
>
Arden Hills Notes Newsletter
>
2010-2019
>
2015
>
May 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2015 4:25:44 PM
Creation date
5/19/2015 4:25:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Postal Customer <br />ECR-WSS <br />PRST STD <br />U.S. Postage Paid <br />St. Paul, MN <br />Permit #1962 <br />I <br />n <br />s <br />i <br />d <br />e <br />Arden Hills, MN . 55112-5734 <br />Valentine Bluff development <br />Royal Hills Park <br />Meet David Perrault <br />County Road E corridor improvements <br />News from the City Council <br />Since the summer of 2013, rail <br />traffic has increased in Arden <br />Hills due primarily to the crude <br />oil production at the Bakken oil <br />fields in North Dakota. As the rail traffic <br />increased, quality of life issues emerged <br />in Arden Hills, primarily relating to <br />increased noise, vehicular street traffic <br />congestion at rail grade crossings, and <br />safety concerns. <br />Train traffic is regulated by the inter- <br />state commerce clause and is within the <br />jurisdiction of the federal government. <br />Consequently, there is little local, county, <br />and state government can do to regulate <br />the amount of train traffic. However, since <br />there is every indication that the train <br />traffic will not decrease in the foreseeable <br />future, Ramsey County and the cities in <br />Ramsey County are working on solutions <br />to improve our quality of life. <br />What is being done currently <br />Ramsey County and its cities have found <br />that working with the railroads themselves <br />has been an effective way to reach some <br />solutions. The Canadian Pacific Rail (CP <br />Rail) and Canadian National Rail (CN <br />Rail) are the main railroad lines that run <br />through Ramsey County. With cooperation <br />from these rail lines and under the author- <br />ity of the Federal Railroad Administration, <br />a Quiet Zone was established at the grade <br />crossing on Lexington Avenue, just north <br />of County Road E in Arden Hills. (There <br />are other Quiet Zones in place or being <br />proposed in Ramsey County.) A Quiet <br />Zone is an exception to the federal law <br />which mandates trains to blow their horns <br />at grade crossings. Additionally, the tracks <br />in Ramsey County are being improved, es- <br />pecially at and near the grade crossings, to <br />allow trains to move faster to comply with <br />Minnesota state law requiring that trains <br />be restricted from stopping vehicular street <br />traffic for more than ten minutes. CP Rail <br />and CN Rail also have been working with <br />Arden Hills residents who live close to <br />railroad tracks to address concerns with <br />noise created when trains stop or back up. <br />Addressing safety concerns <br />The fire departments in Ramsey County, <br />including the Lake Johanna Fire Depart- <br />ment which serves Arden Hills, are receiv- <br />ing increased training on how to manage <br />and control fires in the event there is a rail <br />emergency involving crude oil or an- <br />other flammable liquid. This training also <br />focuses on pipeline and storage tank spills <br />and semi-tractor trailer truck emergen- <br />cies, other ways that flammable liquids are <br />transported throughout Ramsey County. <br />The safety training includes enhanced <br />communication within the emergency <br />response community, safe evacuation <br />methodologies, and fire control using both <br />water and foam. In addition to the rail- <br />road companies that have highly-trained <br />responders, the fire and police departments <br />throughout the Twin Cities area have mu- <br />tual aid agreements—all of which increase <br />the rapid response should an emergency <br />occur. <br />Dealing with increased traffic in Arden Hills <br />Looking to the future <br />Other initiatives to improve rail traf- <br />fic issues are more long-term solutions. <br />The federal government is now mandat- <br />ing improved tank cars carrying volatile <br />liquids, to provide for stronger sides that <br />are more resistant to expansion and explo- <br />sion. There are also proposals for federal <br />legislation to treat flammable liquids to <br />make them less volatile before shipment. <br />Efforts continue to improve the tracks to <br />move all products faster and safer. Finally, <br />there are initiatives to increase the number <br />of oil and gas pipelines, which most safety <br />experts agree are safer than rail or truck <br />transport. However, the timeline for pipe- <br />line construction can be a number of years. <br />The Arden Hills City Council and our City <br />staff are always willing to listen to your <br />concerns and will try to assist to improve <br />the quality of life in Arden Hills with <br />regard to rail traffic or any other concerns <br />you may have. <br />Fran Holmes <br />Fran Holmes <br />City Council <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.