Laserfiche WebLink
PARTIAL PAY ESTIMATE 92 <br />FROM:May 6,2015 <br />TO:May 22,2015 <br />CONTRACTOR: PARK CONSTRUCTION CO. <br />ADDRESS: 1481 81 st AVENUE NE,SPRING LAKE PARK,MN 55432 <br />OWNER:CITY OF ARDEN HILLS <br />PROJECT:COUNTY ROAD E IMPROVEMENTS <br />SUBSTANTIAL COMPLETION DATE AMOUNT OF CONTRACT <br />ORIGINAL:July 31,2015 ORIGINAL: $ 1,349,913.06 <br />REVISED: REVISED: <br />seru........OR[e,IFWE l+tlN7RAG. <br />Nb:: IEEAAIDHSCRIPlIONRRICE:::::'::::::: 3tAl <br />SCHEDULE 1.0-STREET <br />1 2021.501 MOBILIZATION LUMP SUM 1.00 $60,000.00 0.50 30,000.00 0.50 30 000.00 <br />2 2101.502 CLEARING TREE 7.00 $505.00 16.00 8,080.00 16.00 8,080.00 <br />3 2101.507 GRUBBING TREE 7.00 $202.00 16.00 3232.00 16.00 3232.00 <br />4 2104.501 REMOVE PIPE DRAIN LIN FT 70.00 5.65 1 0.00 0.00 0.00 0.00 <br />5 2104.501 REMOVE SEWER PIPE STORM LIN FT 16.00 18.00 0.00 0.00 0.00 0.00 <br />6 2104.501 REMOVE CURB&GUTTER LIN FT 2,797.00 6.55 0.00 0.00 0.00 0.00 <br />7 1 2104.503 REMOVE BITUMINOUS WALK SQ FT 478.00 4.05 400.00 1 620.00 400.00 1,620.00 <br />8 2104.503 REMOVE CONCRETE WALK SQ FT 6.548.00 1.25 0.00 0.00 0.00 0.00 <br />9 2104.503 REMOVE CONCRETE NOSE SO FT 444.00 4.30 444.00 1.909.20 444.00 1,909.20 <br />10 2104.503 REMOVE CONCRETE MEDIAN SQ FT 4,155. 0 1.60 4,155.00 6,648.00 4,155.00 S6,64&00 <br />11 2104.505 REMOVE CONCRETE DRIVEWAY PAVEMENT SQ YD 289.00 15.10 0.00 0.00 0.00 0.00 <br />12 1 2104.505 IREMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD 498.00 7.65 0.00 0.00 0.00 0.00 <br />r1613 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 1,988.00 9.50 0.00 0.00 0.00 0.00 <br />14 2104.509 REMOVE LIGHT UNIT EACH 16.00 $345.00 0.00 0.00 0.00 0.00 <br />15 2104.509 REMOVE DRAINAGE STRUCTURE EACH 3.00 $348.00 0.00 0.00 0.00 0.00 <br />2104.509 REMOVE LIGHT FOUNDATION EACH 16.00 $454.00 0.00 0.00 0.00 0.00 <br />17 2104.509 REMOVE SIGN TYPE C EACH 20.00 40.40 20.00 808.00 20.00 808.00 <br />18 2104.509 REMOVE MARKER EACH 5.00 35.40 5.00 177.00 5.00 177.00 <br />19 2104.513 SAWING BITUMINOUS PAVEMENT FULL DEPTH LIN FT 820.00 3.55 0.00 0.00 0.00 0.00 <br />20 2104.523 SALVAGE HYDRANT EACH 1.00 $283.00 0.00 0.00 0.00 0.00 <br />21 2104.523 SALVAGE SIGN EACH 14.00 40.40 14.00 565.60 14.00 565.60 <br />22 2104.523 SALVAGE DELINEATORS&MARKERS EACH 6.00 35.40 6.00 212.40 6.00 212.40 <br />23 2104.601 REMOVE CABLES LUMP SUM 1.00 $1 590.00 0.00 0.00 0.00 0.00 <br />24 2104.601 RELOCATE SPRINKLER SYSTEM A LUMP SUM 1.00 $4 490.00 0.00 0.00 0.00 0.00 <br />25 2104.601 RELOCATE SPRINKLER SYSTEM B LUMP SUM 1.00 $4.490.001 0.00 0.00 0.00 0.00 <br />26 2104.603 REMOVE AND REPLACE BITUMINOUS PAVEMENT LIN FT 230.00 20.00 0.00 0.00 0.00 0.00 <br />27 2106.607 EXCAVATION-COMMON P CU YD 1,864.00 22.70 0.00 0.00 0.00 0.00 <br />28 2106.607 COMMON EMBANKMENT CV P CU YD 25.00 68.70 0.00 0.00 0.00 0.00 <br />29 1 2106.607 1 SELECT GRANULAR EMBANKMENT C P CU YD 598.00 37.10 0.00 0.00 0.00 0.00 <br />30 2123.610 STREET SWEEPER WITH PICKUP BROOM HOUR 10.00 $126.00 0.00 0.00 0.00 0.00 <br />31 2211.503 AGGREGATE BASE C CLASS 5 P CU YD 1,319.00 30.40 0.00 0.00 0.00 0.00 <br />32 2231.604 BITUMINOUS PATCH SPECIAL SQ YD 427.00 59.90 633.00 37,916.70 633.00 37,916.70 <br />33 2232.501 MILL BITUMINOUS SURFACE 2.0" SQ YD 18 204.00 1.15 0.00 0.00 0.00 0.00 <br />34 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE(4,C) TON 2,860.0 84.301 0.00 0.00 0.00 0.00 <br />35 2360.502 TYPE SP 12.5 NON-WEARING COURSE MIXTURE(4,B) TON 317.00 77.90 0.00 0.00 0.00 0.00 <br />36 2411.618 MODULAR BLOCK RETAINING WALL SO FT 580.00 23.80 0.00 0.00 0.00 0.00 <br />37 2502.521 6"PE NON PERF PIPE DRAIN LIN FT 74.00 18.70 0.00 0.00 0.00 0.00 <br />38 2503.511 15"RC PIPE SEWER CLASS V LIN FT 22.00 64.70 0.00 0.00 0.00 0.00 <br />39 2503.511 18"RC PIPE SEWER CLASS V LIN FT 8.00 68.80 0.00 0.00 0.00 0.00 <br />40 2503.602 CONNECT TO EXISTING STORM SEWER EACH 3.00 $1,000.00 0.00 0.00 0.00 0.00 <br />41 2504.602 CONNECT TO EXISTING WATERMAIN EACH 1.00 $1,490.00 0.00 0.00 0.00 0.00