My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-15-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
06-08-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 5:44:11 PM
Creation date
6/8/2015 5:41:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Amendment Submittal Form <br />May 2011 8 <br />4-NS-524 <br />27. Does the amendment include any wastewater flow to an adjacent community? For new <br />inter-community agreements, the receiving community must also amend the sewer element of its plan. <br /> <br /> Yes. Enclose a copy of the inter-community agreement with the amendment submittal. <br /> No. <br /> <br />Surface Water <br /> <br />28. Will stormwater runoff generated from the amendment be treated on-site? <br /> <br /> No. Check one of the following and describe: <br /> Runoff will not receive treatment. Describe below: <br /> <br /> <br /> Runoff will be treated off-site. Identify off-site treatment facility below: <br /> <br /> <br /> Yes. Describe type and level of on-site pollutant removal treatment/mitigation plans below: <br />According to the AUAR, stormwater will be managed on-site, maintaining the current drainage patterns and utilizing the <br />current outfalls to Rice Creek and Round Lake. Stormwater will be conveyed to Round Lake and Rice Creek by means of <br />underground storm sewer, ponds, vegetated swales, and wetlands. Conveyance systems will be designed in accordance with <br />acceptable industry standards and in conformance with jurisdictional requirements. The primary method of stormwater <br />treatment will be the use of multiple ponds for the removal of total phosphorous and total suspended solids. Water reuse, bio- <br />filtration, filtration, and stormwater wetlands are also suitable for treatment within the Study Area. No discharge water will <br />be directed to surface waters without prior retention in a temporary settling basin and a determination that no contamination <br />exists. The developer will determine if groundwater is contaminated as a basis for determining discharge to storm sewer, <br />sanitary sewer, or through a treatment process such as the existing groundwater treatment facilities. Temporary construction <br />dewatering will require a Temporary Water Appropriations General Permit 1997-0005 if less than 50 million gallons per year <br />and less than one year in duration. <br /> <br />29. Does the community an updated local surface water management plan? <br /> <br /> Yes. Year adopted: 2012 No. Explain below: <br /> <br />30. Does the community have an adopted erosion control or stormwater management <br />ordinance? <br /> <br /> Yes. Year adopted: 2009 No. Explain below: <br /> <br />Water Supply <br />
The URL can be used to link to this page
Your browser does not support the video tag.