My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-15-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
06-08-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 5:44:11 PM
Creation date
6/8/2015 5:41:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills – 2030 Comprehensive Plan <br /> <br /> <br />Approved: September 28, 2009 <br />6-9 <br />15.22. Railroad right-of-way (RR) – public or private freight or passenger <br />rail activities. <br />16.23. Right-of-way (ROW) – public vehicular, transit and/or pedestrian <br />rights-of-way. <br /> <br /> <br />6.4.2 Former City Hall/Public Works Property <br /> <br />The 6.82 acre former City Hall/Public Works property is undergoing a community <br />vision process to determine how the property should be redeveloped (Figure <br />6.4). The property was home to the Arden Hills City Hall and Public Works for <br />many years. While a redevelopment plan for this property was not adopted in <br />time for this Comprehensive Plan, residential uses or a mix of residential and <br />small-scale commercial uses are anticipated. Neither residential nor commercial <br />development should require a change to the future land use designation. <br /> <br />6.4.3 Guiding Plan for the B2 District <br /> <br />In March 2008, the City initiated a visioning and planning process for the B-2 <br />General Business District, which generally includes the commercial properties <br />near County Road E between Lexington Avenue and Hamline Avenue/Highway <br />51 (Figure 6.4). This area hosts a number of retail, service, and office uses. <br />Long considered the “downtown” of Arden Hills, the district is a mix of newer and <br />older buildings. As this corridor ages, market initiated redevelopment is <br />anticipated. <br /> <br />The City completed the planning process and accepted the “Guiding Plan for the <br />B2 District” in October 2008. The Guiding Plan includes a long-term vision for <br />the future redevelopment of this corridor and addresses transportation issues, <br />land uses, infrastructure improvements, landscaping, pedestrian facilities, <br />building design, and site layout among other issues. While the primary uses <br />along this corridor are likely to remain retail, commercial, and office, the Guiding <br />Plan and subsequent land use changes add the possibility for housing in this <br />area. <br /> <br />Although the Guiding Plan document is not adopted as part of the <br />Comprehensive Plan, the future land use map has been updated to reflect the <br />proposed land uses in the B2 District (CMU), and the Capital Improvement Plan <br />(CIP) includes a potential timeline for the public improvements described in the <br />Guiding Plan (Appendix A). <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.