Laserfiche WebLink
City of Arden Hills — 2030 Comprehensive Plan <br /> Table EA - Intercommunity Utility Service Connections <br /> City Sewer flow TO Sewer flow FROM Drinking Water flow TO Drinking Water flow <br /> Arden Hills Arden Hills Arden Hills FROM Arden Hills <br /> Mounds View none none 3 parcels none <br /> Roseville 17 parcels 56 parcels 98 parcels none <br /> Shoreview none 2 parcels 1 parcel none <br /> Total 117 units 158 units 1102 units none <br /> 2. FUTURE DEMAND FORECAST <br /> Municipal sewer service is readily available to all but one property within the City. <br /> Redevelopment and or reuse of existing sites are the largest challenge for the <br /> City in the future. Developers are responsible for extending trunk or lateral mains <br /> to provide for sewer connection in development or redevelopment projects. <br /> Outside of the former Twin Cities Army Ammunition Plant (TCAAP) property, the <br /> majority of the property within the City has been developed and no significant <br /> expansions or land use changes are anticipated. Virtually all sewage flow growth <br /> will be due to redevelopment on the TCAAP property_; , <br /> Sewage flow <br /> from TCAAP will enter the MCES system through M(� FES meter 59 ;n Argon Hills <br /> MCES meter 203 in Mounds View, . There is an <br /> existing agreement between the Cities of Arden Hills, the Department of the <br /> Army, and the City of Mounds View and there is an existing sanitary sewer <br /> connection that would allow sewage to be directed into the Mounds View system. <br /> The City of Arden Hills' community forecasts for total households and <br /> employment along with projected sewer flow through the year 2030 are shown in <br /> Table E.2. The forecasted wastewater flows are based on historical wastewater <br /> flow data and projected sewered housing and employment data as calculated by <br /> the Metropolitan Council in the System Statement. Maximum sewer flow is <br /> anticipated to be reached by 2020. The forecasted wastewater flow to each <br /> MCES meter is listed in Table E.3. <br /> Table E.2-Sewered Population and Flow by Year <br /> Year 2010 2020 2030 <br /> Sewered Population 9.552 11,400 13,300 <br /> Sewered Households 2.957 3,750 4.600 <br /> Sewered Employment 12,402 15,100 17,900 <br /> Average Annual Wastewater Flow(MGD) 0.86 1_3 1.73 <br /> Approved: September 28, 2009 <br /> E-2 <br />