Laserfiche WebLink
Capital Improvement Plan 2016 thru 2020 Department Street Department <br />City of Arden Hills, Minnesota Contact Public Works Director <br />Type Operational Maintenance <br />Project# 11-Str-001 Useful Life 8-10 <br />Project Name Regulatory Street Sign Replacement Program Category Streets:Misc <br />Priority n/a <br />Description <br />Total Project Cost: $50,000 <br />In December 2008,the FHWA adopted changes to the Manual for Uniform Traffic Control Devices(MUTCD)as they relate to reflectivity of <br />regulatory,warning,and guide signs on streets. These changes were adopted to Federal Law. These changes effectively make Engineer Grade <br />signs no longer compliant after 2014. This will be a phased in project beginning with inspection and inventory of our existing signs. This review <br />must be complete before January 2012. After the inspection,a systematic replacement will be developed.All non-compliant regulatory,warning, <br />and ground mounted guide signs must be replaced before January 2015.All non-compliant street name and overhead guide signs must be replaced <br />by January 2018. It is estimated that to maintain the new reflectictivity requirements signs will be replaced with Diamond Grade material and <br />replaced at the end of the warranty period;8-10 years. <br />Sin posts will also be inventoried and replaced as needed to be in compliance with the Federal law. <br />Justification <br />To meet new Federal Law requirements. <br />NOTE:Implementation of the Federal Law was postponed until 2014 so the funds allocated in 2012 have been moved and combined with 2013 <br />monies anticapting work towards meeting the new Federal quidelines will begin in late 2013. <br />Prior Expenditures 2016 2017 2018 2019 2020 Total <br />F___4_0,_00_01 EquipNehicles/Furnishings 10,000 10,000 <br />Total Total 10,000 10,000 <br />Prior Funding Sources 2016 2017 2018 2019 2020 Total <br />40,000 Capital Improvement Funds 10,000 10,000 <br />PIR) <br />Total <br />Total 10,000 10,000 <br />Budget Impact/Other <br />Increased costs for more frequent replacement to meet new retroreflectivity standards <br />Produced Using the Plan-It Capital Planning Software Friday,June Il,2015