My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-15-15-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
06-15-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 3:21:50 PM
Creation date
6/12/2015 11:39:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan 2016 thru 2020 Department Water Department <br />City of Arden Hills, Minnesota Contact Public Works Director <br />EPPr,- <br />oJiectNome <br />ect# 16-W-001 <br />Type Improvement <br />Useful Life 30 <br />New Booster Station Category Utility Improvements <br />Priority 3Important <br />Description <br />Total Project Cost: $1,000,000 <br />This item would construct an additional Water Booster Station near Old Highway 10 and I-694 to pump water from the low pressure zone to the <br />high pressure zone.The booster station would be built on excess Ramsey County right orf way and archecturally the structure would be made to <br />look like a residental house due to its location. <br />Justification <br />The City's water system currently only has one booster station providing water to the high pressure zone through a single crossing of i-694.If <br />anything(lighting strike,wind storm,etc.)knocked out the current booster station for any length on time the high pressure zone could be out of <br />water after the the half million gallon tower is drained. <br />Construction of a second booster station will provide needed redundancy in the system so if one booster station fails or is taken down for service <br />the high pressure zone will still be provided water. <br />Expenditures 2016 2017 2018 2019 2020 Total <br />Construction/Maintenance 1,000,000 1,000,000 <br />Total 1,000,000 1,000,000 <br />Funding Sources 2016 2017 2018 2019 2020 Total <br />County Funds 600,000 600,000 <br />Water Utility Funds 400,000 400,000 <br />Total 1,000,000 1,000,000 <br />Budget Impact/Other <br />Produced Using the Plan-It Capital Planning Software Friday,June 12,2015
The URL can be used to link to this page
Your browser does not support the video tag.