My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-15-15-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
06-15-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 3:21:50 PM
Creation date
6/12/2015 11:39:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan 2016 thru 2020 <br />Department Water Department <br />City of Arden Hills, Minnesota Contact Public Works Director <br />Project# 17-W-001 <br />Type Maintenance <br />Useful Life 30 <br />Project Name CR E2 Water Replacement/Old Hwy 10 Water Loop Category Utility Maintenance <br />Priority 4 Less Important <br />Description Total Project Cost: $400,000 <br />Water main on CR E2 from Old Hwy 10 to Valentine Hills School has experienced numerous breaks.Most recently in 2015 there were three <br />different breaks when this section of water main had to be fed from the high pressure zone for a few days.All three breaks where due to deteriation <br />of the pipe material until a hole appeared. <br />Aslo,by creating a loop in the low pressure system by connecting the water main on CR E with this main on CR E2 the City will be better able to <br />fed the low pressure system by rerouting and not have to rely on temporary feds from the high pressure system. <br />Justification <br />Recent water main breaks(three in 2015)on this section of main on CR E2 have all shown a deteriated pipe material.Water breaks are exected to <br />contiue with high frequency as the pipe material continues to wear thin. <br />Looping the low pressure system along Old Hwy 10 will provide needed additional redunancy in the system. <br />Expenditures 2016 2017 2018 2019 2020 Total <br />Construction/Maintenance 400,000 400,000 <br />Total 400,000 400,000 <br />Funding Sources 2016 2017 2018 2019 2020 Total <br />Water Utility Funds 400,000 400,000 <br />Total 400,000 400,000 <br />Budget Impact/Other <br />Produced Using the Plan-It Capital Planning Software Friday,June 12,2015
The URL can be used to link to this page
Your browser does not support the video tag.