My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-15-15-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
06-15-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 3:21:50 PM
Creation date
6/12/2015 11:39:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan 2016 thru 2020 <br />Department Equipment <br />City of Arden Hills, Minnesota Contact Public Works Director <br />EP"jectName <br />ect# 16-Eqp-004 <br />Type Equipment <br />Useful Life 20 <br />Replace Air Compressor Category Equipment:Public Works <br />Priority 4 Less Important <br />Description Total Project Cost: $27,500 <br />Replace a 1998 air compressor <br />Justification <br />The current air compressor will be 19 years old in 2016.The air compressor is used for maintaining irrigation systems,jack hammering,installing <br />street sign post,and blowing out cracks prior to crack filling material being applied. <br />Note:Moved from 2016 to 2017.5/14/14 TJM <br />Expenditures 2016 2017 2018 2019 2020 Total <br />Equip/Vehicles/Furnishings 30,000 30,000 <br />Estimated Trade-In Value 2,500 2,500 <br />Total 27,500 27,500 <br />Funding Sources 2016 2017 2018 2019 2020 Total <br />Equipment/Building 27,500 27,500 <br />Replacement Fund <br />Total 27,500 27,500 <br />Budget Impact/Other <br />Produced Using the Plan-It Capital Planning Software Friday,June 12,2015
The URL can be used to link to this page
Your browser does not support the video tag.