My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-15-WS
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2015
>
06-17-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 12:41:40 PM
Creation date
6/12/2015 12:36:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills – 2030 Comprehensive Plan <br /> <br /> <br />Approved: September 28, 2009 <br />11-11 <br />shoulders, or when possible, turn lanes to City collector roadways intersecting <br />with County roadways. To accommodate necessary turn lanes or roadway <br />widening, additional right-of-way may be required at the intersection. As <br />reconstruction of aging infrastructure is pursued on City collector streets the <br />recommended geometric design standards will assist in improving safety and <br />mobility (Appendix B). <br /> <br />Additionally, as traffic volumes approaching an intersection increase, an <br />intersection control evaluation may be necessary. Triggers for an evaluation may <br />include an increase in correctable crashes or an unacceptable traffic back up. <br />Higher volume roadways that could show traffic signal benefits are under the <br />jurisdiction of the County. As the jurisdictional authority, the County would make <br />decisions on appropriate traffic control. The intersection control evaluation would <br />identify the traffic control option (e.g. all way stop, roundabout, possible <br />signalization) and capacity improvements (e.g. turn lanes) necessary to <br />accommodate the traffic volumes in a safe and efficient manner. Future <br />reconstruction may require modifications of existing access to include strategies <br />such as access consolidation, right–in, right–out access only, or the development <br />of a frontage road to improve the safety and mobility of the corridor. Additional <br />right-of-way should be acquired for future improvements as properties in the area <br />develop or redevelop. <br /> <br />The high crash locations along I-694 at I-35W, TH 10, and TH 51 should be <br />partially rectified by the proposed improvements on I-694 through the area. This <br />improvement includes additional lanes, and the improvement of the TH 51 ramp <br />access to eastbound I-694, one of the highest crash locations in the Arden Hills <br />area. Further improvements should be studied with the Minnesota Department of <br />Transportation and Ramsey County at the interchange ramps and intersections. <br /> <br />The current proposed interchange on TH 10 should improve the operations along <br />TH 10 and also CSAH 96 near TH 10. This interchange would enable a <br />separation of the traffic on each corridor, improving operations to both. <br /> <br />11.3.3 Functional Classification Needs <br /> <br />Due to the developed nature of the City of Arden Hills, together with the <br />community’s pattern of water features and freeway facilities, there are minimal <br />opportunities to expand the local roadway system in the developed areas of the <br />City and develop additional continuous routes through the City. <br /> <br />As redevelopment occurs on the TCAAP property, the local roadway system will <br />be expanded to serve this area of the City. The internal roadway system for
The URL can be used to link to this page
Your browser does not support the video tag.