Laserfiche WebLink
City of Arden Hills – 2030 Comprehensive Plan <br /> <br /> <br />Approved: September 28, 2009 <br />9-8 <br />o Cummings Park – Explore the possibility of adding irrigation to the soccer <br />fields. This will enhance the quality of the fields and allow for additional <br />usage. Add benches along the paths and park amenities. <br /> <br />o Floral Park –Additional unpaved looped paths could be constructed in the <br />park to provide more walking and nature watching opportunities. Add <br />benches along the paths and park amenities. <br /> <br />o Freeway Park - Consider paving the hockey rink for year-round use. <br />Upgrade existing half basketball court. <br /> <br />o Hazelnut Park – Replace the warming house with a new structure and <br />provide a safer access to the rink. Install shaded benches near <br />recreational features. Add lights from parking lot to skating rink. Add a <br />picnic shelter or pavilion to meet the usage demands of the park. <br /> <br />o Ingerson Park – Add a connecting path to Lexington Avenue, Fernwood <br />Court, and Lake Lane, utilizing a sewer easement to Fernwood as a path <br />corridor and Lake Lane as a path access point. <br /> <br />o Johanna Marsh – Resurface tennis courts, add a park sign, and add <br />benches. <br /> <br />o Lindey’s Park – Provide benches. Utilize the Bocce Golf Course for <br />recreation programming. <br /> <br />o Round Lake Open Space – Explore the possibility of adding a path <br />connecting Old Highway 10 to the path west of Round Lake by easement <br />or land acquisition. Add a parking lot at Parkshore Drive. Determine what <br />type of amenities/fields meet the needs of the community and develop the <br />park. <br /> <br />o Royal Hills – Add a fence along the outfield and sideline of the ball field to <br />minimize balls going into the woods. <br /> <br />o Sampson Park – Add landscaping within the park to provide interest and <br />improve aesthetics. Replace the parking lot surface of the basketball <br />court with a colored, bituminous surface. <br /> <br />o Valentine Park – Complete drainage study and drainage improvements <br />for the future of the park. Future Improvements are contingent upon the <br />results of the study: Consider reconfiguring parking lot to detach park