Laserfiche WebLink
City of Arden Hills – 2030 Comprehensive Plan <br /> <br /> <br />Approved: September 28, 2009 <br />9-10 <br />Table 9.2 - Trail Improvement List <br />Feet Miles <br />A Cleveland Ave. (County Road "D" to Stowe Ave.)2,623 0.50 <br />A.2 Cleveland Ave. (Thom Ct. to existing path off Cty E2)1,672 0.32 <br />B County Road D (Cleveland to New Brighton Road)2,644 0.50 <br />C New Brighton Road (County Rd. D to Stowe Ave.)2,957 0.56 <br />C.1 New Brighton Road (Stowe Ave. to County Road E2)5,333 1.01 <br />D County Road E2 (New Brighton Rd. to Old Hwy. 10) Completed 3,309 0.63 <br />D.1 County Road E2 (Cleveland Ave. to New Brighton Rd.)671 0.13 <br />E R.C. Open Space (from Cty Rd. E2 to Venus) Completed 686 0.13 <br />E.1 R.C. Open Space (from segment E path to MVHS)2,974 0.56 <br />F Tony Schmidt Underpass trail North to County Road E2 (lift station rd.)1,560 0.30 <br />F.1 Perry Park Pavilion to Underpass Trail Head Completed 1,399 0.27 <br />G County Road E (Indian Pl. to Lk. Joh. Blvd. to Tony Schmidt U. Trail to end of park - north side)2,787 0.53 <br />G.1 Lake Johanna Blvd. (From Segment G to Old 10 - Snelling)1,742 0.33 <br />H County Road E (Old 10-Snelling to Connelly Ave.)2,185 0.41 <br />I Snelling Ave. (Highway 51 to County Road E)4,382 0.83 <br />I.1 Old Highway 10-Snelling (Cty Road E2 through CP Rail)1,056 0.20 <br />I.2 Old Highway 10-Snelling (from CP Rail to County Rd. E2)2,270 0.43 <br />I.3 Old Highway 10-Snelling (from Cty. Road E2 to Hwy. 96)8,870 1.68 <br />J Lake Valentine Road (Mounds View H.S. to Old 10-Snelling)1,600 0.30 <br />K Parkshore Dr. (from Old Hwy 10-Snelling to beginning of Rd. Lake Trail)2,395 0.45 <br />K.1 Gateway Blvd. (from proposed segment K to Round Lk. Road)2,165 0.41 <br />K.2 Round Lake Trail (Complete the loop that has a gap behind Nott Co.)2,421 0.46 <br />K.3 Round Lake Road W. (from Gateway Blvd. to existing trail off of 96) Completed 2,634 0.50 <br />L County Road 96 (Complete trail west from existing path to 35W)3,100 0.59 <br />M North Snelling Ave. (From County Road 96 to Briarknoll)2,827 0.54 <br />N County Road F (From Existing Sidewalk from Lexington to Hamline)400 0.08 <br />N.1 Hamline (From County Road F to Floral Drive Completed 605 0.11 <br />O Lexington Ave. (From County Road F to County Road E)1,500 0.28 <br />O.1 Lexington Ave. (From County Road E to Shoreline Lane)5,212 0.99 <br />O.2 Lexington Ave. (From Tanglewood to County Road I - West Side)7,890 1.50 <br />P Crepeau Preserve (From Cannon to Crepeau Nature Preserve)838 0.16 <br />P.1 Pine Tree Drive(From Cty Road E to existing grass trail into Crepeau) Completed 1,266 0.24 <br />Q Highway 51 (From Old Hwy. 10/Snelling to just past Glenhill Rd)1,373 0.26 <br />R County Road E - (From Lexington Trail to existing Concrete Sidewalk & Connelly Ave) Completed 2,050 0.10 <br />T.1 Spine Road Trail (From HWY 96 to County Road H)7,689 1.40 <br />T.2 Town Center Trail (Along Water Infrastructure)4,267 0.80 <br />T.3 Rice Creek North Trail Corridor Addition (From HWY 96 to Rice Creek North Regional Trail)8,977 1.70 <br />Total Proposed Future Trails 108,329 20.19 <br />LengthSegmentProposed Trail Location <br /> <br />The above list is not a ranked priority list of proposed path expansions and <br />upgrades. The City has identified certain trail segments that are crucial for <br />developing needed north-south and east-west path connections that are divided <br />by major highways: G, G1, H, I, I1, I2, and I3. In coordination with the capital