My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-03-14 PCWork Session Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2014
>
12-03-14 PCWork Session Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 4:18:20 PM
Creation date
6/17/2015 4:18:12 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
View images
View plain text
<br /> <br /> <br /> <br /> <br />Approved: January 7, 2015 <br /> <br />CITY OF ARDEN HILLS, MINNESOTA <br />PLANNING COMMISSION <br />WORK SESSION <br />WEDNESDAY, DECEMBER 3, 2014 <br />ARDEN HILLS CITY HALL <br /> <br /> <br />CALL TO ORDER/ROLL CALL <br /> <br />Pursuant to due call and notice thereof, Chair Clayton Larson called to order the work <br />session meeting at 6:54 p.m. <br /> <br />ROLL CALL <br /> <br />Present were: Chair Clayton Larson, Commissioners Brent Bartel, Andrew Holewa, <br />Steven Jones, Roberta Thompson, and Clayton Zimmerman. <br /> <br />Absent: Commissioner Angela Hames. <br /> <br />Also present were: City Planner Ryan Streff; Associate Planner Matthew Bachler; and <br />Councilmember Fran Holmes. <br /> <br />APPROVAL OF AGENDA – DECEMBER 3, 2014 <br /> <br /> The Agenda was approved as presented. <br /> <br />DISCUSSION ITEMS <br /> <br />A. TCAAP Redevelopment Code (TRC) – Chapters 8-11 <br /> <br />Associate Planner Bachler provided the Council with overview on Chapters 8 through 11 of the <br />TCAAP Redevelopment Code (TRC). He explained that Chapter 8 establishes design standards <br />for the different street types on TCAAP as well as connectivity standards for the overall street <br />network. Attachment 5 in the TRC provides cross section illustrations for each street <br />classification that set requirements for elements such as travel lanes, on-street parking, bicycle <br />accommodation, streetscape standards, and sidewalk standards. Site plan or subdivision <br />applications for areas of four acres or larger will be required to submit a Project Circulation Plan <br />that demonstrates how on-site circulation will meet the requirements included in Chapter 8. <br /> <br />Associate Planner Bachler reported that Chapter 9 addresses requirements for public and <br />private open space areas on TCAAP. The Regulating Plan designates areas for public open space <br />and Attachment 3 in the TRC includes specific standards that address general character, design,
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).