My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-15-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2015
>
07-08-15-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 1:06:58 PM
Creation date
8/13/2015 12:32:19 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br />Planning Commission Meeting for July 8, 2015 <br /> <br />P:\Planning\Planning Cases\2015\PC 15-015 - TCAAP CPA & TRC\Memos_Reports <br />Page 3 of 7 <br />the TRC. The section on development capacity and net residential density has also be revised to <br />reflect the forecasted number of residential acreage and units for the TCAAP site. <br /> <br />Chapter 7 – Housing (Attachment D) <br />Chapter 7 provides information on the City’s current housing stock, existing housing issues, such <br />as diversity and affordability, and projected future housing needs. This chapter has been updated <br />to included information on the projected household forecast numbers for the City based on the <br />Metropolitan Council’s regional forecast for 2040, and the expected number of housing units and <br />different types of housing products that will be accommodated on TCAAP. <br /> <br />Chapter 9 – Parks and Recreation (Attachment E) <br />Chapter 9 discusses the existing regional and local park and recreation system and the proposed <br />upgrades to the City’s parks and pathways. This chapter has been updated to include the <br />proposed trail improvements and required public parks and open spaces for the TCAAP <br />redevelopment. Updates were also made based on the approved 2013 Rice Creek North <br />Regional Trail Corridor Master Plan Amendment. <br /> <br />Chapter 11 – Transportation (Attachment F) <br />Chapter 11 evaluates the City’s existing transportation system, looking at issues such as traffic <br />volumes and capacity, relevant transportation studies, and multimodal transportation. The <br />chapter also proposes a future transportation system plan. A detailed traffic study was completed <br />as part of the TCAAP AUAR and a summary of this study has been included in Chapter 11. <br />Road construction and improvements to be completed in conjunction with the TCAAP <br />redevelopment have been incorporated into the future transportation system plan. The <br />multimodal transportation section has been updated to include the Metropolitan Council’s <br />current consideration of extending the A-line BRT (Bus Rapid Transit) route to TCAAP. <br /> <br />Chapter 13 – Public Facilities, Services, and Infrastructure (Attachment G) <br />Chapter 13 summarizes the separate management plans the City has in place for water supply, <br />sanitary sewer, and stormwater. The public facilities management plans have been updated as <br />needed to include the recommendations from the approved AUAR. This chapter includes an <br />overview of the proposed regional stormwater management plan for the TCAAP development. <br /> <br />Appendix E – Sanitary Sewer Plan (Attachment H) <br />Appendix E discusses the existing and future sanitary sewer plans for the City. This appendix <br />outlines the existing sanitary sewer system, intercommunity services, sewer volume forecast, <br />sanitary sewer service districts, projected sewage flows, individual sewage treatment systems, <br />infiltration/inflow, and the proposed capital improvement program to complete the sewer <br />improvements. <br /> <br />Appendix H – Zoning District Regulations (Attachment I) <br />Appendix H in the Comprehensive Plan outlines all zoning districts within the City. In order to <br />update the Comprehensive Plan the new zoning districts proposed in the TRC have been <br />included in Appendix H.
The URL can be used to link to this page
Your browser does not support the video tag.