My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-05-15-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2015
>
08-05-15-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 1:13:27 PM
Creation date
8/13/2015 1:08:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> <br />COMM. NO.: 613101211 <br />CLIENT: Boston Scientific <br />PROJECT: Day Care Relocation <br /> <br />SUBJECT: Land Use Application Narrative <br />MEMO BY: Judd Brasch, RSP Architects <br />DATE: July 6, 2015 (Revised July 27, 2015) <br /> <br />ATTENTION: Ryan Streff, City Planner, City of Arden Hills <br />COPY: Emily Colletti, Boston Scientific <br /> <br /> <br />Boston Scientific is planning to relocate its existing New Horizon managed Day Care Facility from <br />Building 9, at the north edge of the campus ,to Building 10, in the center of the Arden Hills Campus. The <br />relocation will help facilitate the planned interior reconfiguration of existing distribution and <br />manufacturing space and allow the expansion of the day care to comply with current state day care <br />guidelines. <br /> <br />The existing day care is approximately 7,300 SF of interior space located at the north east corner of the <br />ground floor of Building 9, with a fenced exterior play area to the north. The relocated facility will be <br />approximately 8,500 SF and contain the same child care program of three infant rooms, two toddler <br />rooms, and three pre-school rooms with the addition of a new indoor play area now required for large <br />muscle development. The new facility will be located in the central area of the east side of the ground <br />floor of Building 10. A new fenced exterior play area will also be built along the east side of the day care. <br /> <br />A new building entrance directly into the day care will require a new concrete stoop with a ramped <br />concrete side walk for accessibility. Approximately 5,550 SF of bituminous and sidewalk will be <br />removed to allow for the installation of 3,125 SF of resilient exterior play surface and 1,880 SF of <br />concrete side walk for a net decrease of 550 SF of impervious surface. The existing fence and play <br />equipment will be removed from the current exterior play area (approximately 3,000 SF). <br /> <br />Three new 3” boulevard trees matching the existing species will be planted along Innovation Way. Five <br />new shrubs will be planted to screen the existing electrical transformer. <br /> <br />The day care relocation and bituminous removal will eliminate 11 existing parking stalls adjacent to the <br />east side of the building. The north curb cut in the existing dive through configuration will be eliminated. <br />The eleven eliminated stalls will be added to the 125 stalls currently stripped along innovation way <br />making the total 136 spaces. We are proposing to leave the 50 stalls as striped both sides of the road, <br />south of Boston Scientific Drive; leaving as striped the 55 stalls along the east side of the road north of <br />the enclosed walkway crossing. In the area north of Boston Scientific Drive and south side of the enclosed
The URL can be used to link to this page
Your browser does not support the video tag.