Laserfiche WebLink
----AEN HILLS <br /> MEMORANDUM <br /> TO: City Council <br /> FROM: Joe Lynch, City Administrato <br /> SUBJECT: City Monument Sign <br /> DATE: June 7, 2001 <br /> Background <br /> Enclosed within is a copy of the revised monument sign at the entrance to City Hall. We have <br /> asked Architectural Alliance to incorporate the new logo and script of the City of Arden Hills <br /> into the monument sign and asked for the cost to do so. The new signage would eliminate the <br /> previous 8"high black anodized metal strip with the block letters. The new signage includes <br /> Kasota stone so that it is all the same stone with pin letters extending out from the face of the <br /> stone. <br /> I have received a cost estimate from Architectural Alliance for the changes in the sign. The total <br /> cost estimate which includes the additions is $9,556.00. This includes an$880 credit for deletion <br /> of the composite panel (this is the anodized black metal metal) and the 8"block letters at original <br /> bid of$1,152.00. The additional expense of$10,622.00 is for 8"by 3/4"router letters with the <br /> custom font and painted enamel finish. <br /> Recommendation <br /> Staff recommends that the Council authorize the architect to make the changes to the monument <br /> sign as requested and Rochon to incorporate the changes to the City Hall contract for the sign in <br /> the amount of$9,556.00. <br />